Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

PJM GENERATOR EXAM (ACTUAL) 2024 QUESTIONS AND ANSWERS

Document preview thumbnail
Preview 2 out of 9 pages

PJM GENERATOR EXAM (ACTUAL) 2024 QUESTIONS AND ANSWERS

Content preview

PJM GENERATOR EXAM (ACTUAL)

If PJM ACE shows overgeneration, actual imports are - ANSWERS-less than
scheduled.



Which of the following reports will PJM request when a Maximum Generations
Emergency Alert is issued? - ANSWERS-Supplementary Status Report



If a fossil steam unit has less than 32 hours of fuel at maximum capacity, it should
be bid at - ANSWERS-maximum emergency.



PJM responds to capacity shortages by issuing alerts - ANSWERS-in advance of a
scheduled load period to allow sufficient time for members to prepare for
anticipated initial capacity shortages.



During black start restoration, priority access to cranking power should be given
to - ANSWERS-hot units that can return to service immediately



Which of the following factors does NOT influence the load forecast? - ANSWERS-
planned generation outages



Severe cold weather conditions require which of the following to be staffed,
started, and available for loading? - ANSWERS-Combustion turbines and diesels

, During system restoration, a generator should not be loaded above the level of
available - ANSWERS-dynamic reserve



The minimum passing score for a unit regulation test is - ANSWERS-75%
compliance with test signal



PJM limits interchange to a - ANSWERS-change in total net interchange of 1000
MW every 15 minutes



Which of the following PJM systems are used to report unit outages? - ANSWERS-
eDART, eMKT, and eGADS



The purpose of the Deploy All Resources Action is to instruct all generating
resources to be on line and at full output _________ - ANSWERS-immediately
upon receipt of dispatch instruction



A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO.
Generation Operators should: - ANSWERS-Ensure all unit voltage regulators are in
service



PJM can issue the Deploy All Resources Action for________ - ANSWERS-the entire
RTO, specific Control Zones or a subset of a Control Zone if transmission
limitations exist

Document information

Uploaded on
August 7, 2024
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Teacher101
4.6
(277)
Sold
520
Followers
74
Items
11441
Last sold
4 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions