Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

MSSC; MAINTENANCE AWARENESS EXAM

Document preview thumbnail
Preview 2 out of 11 pages

MSSC; MAINTENANCE AWARENESS EXAM...

Content preview

MSSC; MAINTENANCE AWARENESS EXAM
Circuit testers assess if ______ electricity is present - answer AC.

In a PM audit, a large number of uncompleted PM work orders would most likely
have a negative influence on the results. - ANSWER Critical Path


What is the purpose of Total Productive Maintenance (TPM)? - ANSWER: Zero
failures and faults.


A chain should be changed when it reaches a length that is _______ longer than the
original. - ANSWER 3 percent


Before shutting down a machine for preventive maintenance, the maintenance
specialist must remove all of the trash and sediment from the machine.


Where would a worker obtain information regarding the use of all lubricants and
safety precautions—ANSWER SDS file


When lubricating a bearing, the worst mistake is to get dirt in the bearing.

The most evident evidence that V-belt pulleys are worn beyond usefulness is when
the ANSWER belt touches the bottom of the groove.

Which of the following is an essential planned maintenance activity? ANSWER:
Lubricate equipment.

Preventive maintenance programs would often include ANSWER frequency.


It is vital to have a/an ________ for the closure of PM work orders. ANSWER
completion date

, Frequently, the employee finishing out the PM work order ensures that - ANSWER
preventive maintenance was accomplished.


Which of the following bolts has a value of 5? - Answer the screw with three lines.


Scheduled repair of minor parts that wear quickly is a crucial aspect of __________
maintenance. - The answer is preventive.


Which of the following would be considered an unscheduled downtime
maintenance activity? - ANSWER Reactive Maintenance


All documentation for preventative maintenance should be retained in a specified,
safe, and secure area.


Making sure that a motor shaft is level - ANSWER lowers the amount of required
shims


When testing for out-of-round, any movement of the dial indicates that the -
ANSWER shaft could be out-of-round.


Follow-up work created after considering PM - ANSWER predictive


Daily maintenance requires keeping daily records since repeating events can be
studied to troubleshoot problems.



A machine is expected to have downtime throughout multiple shifts. What is the
proper way to communicate between shifts for lockout/tagout procedures? -
ANSWER Send a company-wide email; maintenance personnel should check for
energy and change locks.

Document information

Uploaded on
August 4, 2024
Number of pages
11
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
luzlinkuz
3.8
(328)
Sold
1596
Followers
852
Items
32398
Last sold
1 week ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions