Project Analysis Test 2 Yantis Study
Guide
what are the steps to starting a project? - Answer -Establish a project need (why)
-Define project scope (what)
-Understand team members (who)
-Confirm critical authorities and milestones (when)
-Define project tools and protcool (how)
what are the project parameters? - Answer Cost, schedule, quality
what are the four crtical P to selecting a team? - Answer Process (delivery method),
product (type of building), Proximity (Location), people (each other)
What does the overall project schedule include? - Answer All activities/members of the
project
What does FFE stand for? - Answer Furniture, fixture, and equipment
what are the most important days in construction? - Answer the first 60 days and the last
60 days
what does the budget mean? - Answer how much you can spend
what does the estimate mean? - Answer how much you are going to spend
what is billing mean in terms of costs? - Answer how much you actually spend
What is included in project cost? - Answer design, preconstruction, profit and overhead
what are the steps to closing a project? - Answer 1. transmit closeout documents
2. Train and orient maintance team
3. Final change orders
4. Archive project documents
5. celebration
which delivery methods have multiple estimates in design? - Answer cm at risk, design
build, integrated project delivery
what are some scope that can affect the cost of a project? - Answer -use of building,
site, sustainability, subtotal A
, What is subtotal A - Answer Size, duration, scope
what is subtotal b - Answer location
what are some affects on subtotal b location - Answer freight/delivery, labor and unions,
site and soils (foundations), urban or rural logistics, weather (NOAA), taxes, permits,
regulations
what are things that can affect timing in a conceptual estimate? - Answer when you are
going to start the project, summer/winter, inflation (3-4% a year), escalation, demand of
trade market
what are the cost for design continegency for Schematic, DD, and CD - Answer sd - 10%
DD- 5%
CD-0%
What is the percent cost for preconstruction services usually? - Answer 1%
what are the key 10 steps to scheduling? - Answer 1. Project delivery
2. Overall project schedule (identify key memebrs)
3.Site analysis
4. Site Logistics
5. Building analysis
6. sequencing
7.milestones
8. Long lead
9. Building Systems
10. Plan 4 times
what are the three R's? - Answer -Risk
-Resources
-Reward
What does Risk mean in the three R's for tatical? - Answer scope, performance of trades
and team
what does resources mean in the three R's for tatical? - Answer Capacity of trades and
team
Guide
what are the steps to starting a project? - Answer -Establish a project need (why)
-Define project scope (what)
-Understand team members (who)
-Confirm critical authorities and milestones (when)
-Define project tools and protcool (how)
what are the project parameters? - Answer Cost, schedule, quality
what are the four crtical P to selecting a team? - Answer Process (delivery method),
product (type of building), Proximity (Location), people (each other)
What does the overall project schedule include? - Answer All activities/members of the
project
What does FFE stand for? - Answer Furniture, fixture, and equipment
what are the most important days in construction? - Answer the first 60 days and the last
60 days
what does the budget mean? - Answer how much you can spend
what does the estimate mean? - Answer how much you are going to spend
what is billing mean in terms of costs? - Answer how much you actually spend
What is included in project cost? - Answer design, preconstruction, profit and overhead
what are the steps to closing a project? - Answer 1. transmit closeout documents
2. Train and orient maintance team
3. Final change orders
4. Archive project documents
5. celebration
which delivery methods have multiple estimates in design? - Answer cm at risk, design
build, integrated project delivery
what are some scope that can affect the cost of a project? - Answer -use of building,
site, sustainability, subtotal A
, What is subtotal A - Answer Size, duration, scope
what is subtotal b - Answer location
what are some affects on subtotal b location - Answer freight/delivery, labor and unions,
site and soils (foundations), urban or rural logistics, weather (NOAA), taxes, permits,
regulations
what are things that can affect timing in a conceptual estimate? - Answer when you are
going to start the project, summer/winter, inflation (3-4% a year), escalation, demand of
trade market
what are the cost for design continegency for Schematic, DD, and CD - Answer sd - 10%
DD- 5%
CD-0%
What is the percent cost for preconstruction services usually? - Answer 1%
what are the key 10 steps to scheduling? - Answer 1. Project delivery
2. Overall project schedule (identify key memebrs)
3.Site analysis
4. Site Logistics
5. Building analysis
6. sequencing
7.milestones
8. Long lead
9. Building Systems
10. Plan 4 times
what are the three R's? - Answer -Risk
-Resources
-Reward
What does Risk mean in the three R's for tatical? - Answer scope, performance of trades
and team
what does resources mean in the three R's for tatical? - Answer Capacity of trades and
team