CSIT 120 Final || Already Passed.
SDLC correct answers is a framework defining tasks performed at each step in the software development process. is a structure followed by a development team within the software organization. It consists of a detailed plan describing how to develop, maintain and replace specific software. Phases of SDLC correct answers 1. System definition 2. Requirements analysis 3. Component design 4. Implementation 5. Maintenance System Definition correct answers -define system goals and scope. -Assess feasibility (cost, schedule, technical, organizational). -Form project team. -Plan project Assign team to define: -New system -Assess feasibility -Plan the project. •Initial team - includes users and IS professionals requirements analysis correct answers heavy with business and systems analysts. -Determine and document the specific features and functions of a new system •Test Plan is based on System Requirements-Once project accepted outside developers / contractors typically receive (largest portion of) payment •If not well defined, ramifications throughout project form a project team correct answers Typical development team •Systems analyst and/or business analyst Managers •Programmers •Software testers •Users •Outside contractor Component Design correct answers 1.Determine hardware specifications 2.Determine software specifications 3.Design database 4.Design Procedures-Normal, backup, and failure recovery procedures 5.Design Job Descriptions-Create and define new tasks and responsibilities Implementation correct answers -Build system components
Written for
- Institution
- CSIT 120
- Course
- CSIT 120
Document information
- Uploaded on
- August 1, 2024
- Number of pages
- 8
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal