Maine Fuel Board Tank Setter Updated 2024/2025 Actual Questions and answers with complete solutions
A customer wants to abandon an underground tank what method is is not an approved method for abandoning the tank? - Pulling a Vacuum A customer wants to abandon an underground tank. What method is not an approved method for abandoning the tank? - Pulling a vacuum A pressure regulator for LP gas designed to reduce pressure from the container to a lower pressure in excess of 1 psi is defined as? - First stage regulator A propane natural gas helper may only work under what circumstances? - The direct supervision of a licensed propane natural gas technician After Bulk plant construction what must be done prior to placing plant into operation? - A fire safety analysis After the first successful cathodic test how soon after must the second test be performed? - 12-18 months Are cast iron fittings allowed in out door piping? - No Are dryer vents considered a source of ignition? - No, They are considered an opening to the building.
Written for
- Institution
- Maine Fuel Board Tank Setter
- Course
- Maine Fuel Board Tank Setter
Document information
- Uploaded on
- July 30, 2024
- Number of pages
- 5
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
maine fuel board tank setter
Also available in package deal