• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 6 pages
Exam (elaborations)

A smart current control for superconducting cable test

Document preview thumbnail
Preview 2 out of 6 pages

A smart current control for superconducting cable test Pasquale Arpaia1,2, Amalia Ballarino1, Vincenzo Daponte1,3, Domenico Maisto4, Giuseppe Montenero1,2, Cesare Svelto3 1CERN (TE-MSC-SCD, 30-04-030, CH-1211 Geneva 23, Switzerland, ph. , fax , ) 2Università del Sannio (Dept. of Engineering, Corso Garibaldi 102, 82100 Benevento, Italy, ph. , fax , ) 3Politecnico di Milano (Dip. Elettron. Inform e Bioing., Leonardo da Vinci 32, 20133 Milano, Italy, ph. , fax: , , ) 4CNR Institute for High Performance Computing and Networking (Via Pietro Castellino 111, 80131 Napoli, Italy, Ph. , fax ) Abstract- A smart current control system for enhancing performance of a superconducting cable test station is proposed. According to the Fuzzy Gain Scheduling logic, the controller parameters are modulated by the working conditions. An improved flexibility for the definition of the set point is achieved. The system effectiveness has been proved through several simulations and demonstrated experimentally on the Facility for Research on Superconducting Cables at European Organization for Nuclear Research (CERN). I. Introduction The superconductivity is widely exploited in many applications from applied physics to engineering. In all the applications, the characterization of the superconducting cables is a key point and has to be carried out thoroughly by means of ad hoc testing. In test facilities, often cables are tested by a superconducting transformer in order to cut operation cost [1]-[2]. In the Facility for Research on Superconducting Cables (FReSCa) at CERN, the current driven in the sample is controlled by a digital Proportional Integral (PI) control. However, bandwidth constraints require the definition of slow start and stop for current ramping. Furthermore, available control strategy limits the acceleration at 800 As-2. Finally, the system to be controlled, namely the chain current source and superconducting transformer, exhibits significant non-linear behaviour. Control performance can be improved by taking into account the system variations in the design of the control strategy. Adjusting control parameters according to the system behaviour is the main feature of the Adaptive Control (AC) strategies [3]. Assuming a deep knowledge on the system dynamic, the Gain Scheduling (GS) control strategy is the most suitable to perform this task [3], with a particular focus on the Fuzzy PI Gain Scheduler (FGS) [4]. The GS strategy divides the operating domain in several subspaces, according to the homogeneity of the system behaviour. In this paper, a smart current control system, for improving metrological performance of a superconducting cable measurement station, is proposed. The controller is based on an ad-hoc adaptive GS strategy, customized by means of a Takagi-Sugeno-Kan (TSK) Fuzzy inference [5], exploiting the representation capability of Fuzzy system to realize a suitable PI controller for each working condition. In particular, in Section II, state-of-the-art controllers of superconducting transformers are reviewed, and in Section III, a background on Fuzzy Gain Scheduling is reported. In Section IV, the proposed adaptive control system is outlined, and in Section V, the experimental validation results at FReSCa of CERN are illustrated. II. Digital control for superconducting transformer: a review In measurement stations based on superconducting transformers (Fig. 1), the cable is linked to the transformer secondary and the current Is flowing into the sample is sent through the feedback loop to the control system. 733 ISBN-10: 84-616-5438-2 | ISBN-13: 978-84-616-5438-3 19th IMEKO TC 4 Symposium and 17th IWADC Workshop Advances in Instrumentation and Sensors Interoperability July 18-19, 2013, Barcelona, Spain Figure 1 Architecture of a cable test station based on superconducting transformer. The measurement system integrates the voltage read from the Rogowski coils, by measuring the current on the sample; this value, subtracted from the current reference IRef,


Document information

Uploaded on
July 27, 2024
Number of pages
6
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$14.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
215
Followers
44
Items
2637
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.