Lead Abatement Question and answers already passed
Lead Abatement Question and answers already passed Lead based paint - correct answer 1.0 mg/cm2 or 0.5% blood lead level - correct answer 10 ug/dl (NH) 5ug/dl (CDC) Preliminary clearance - correct answer After hazards removed final clearance - correct answer Painted, sealed, cleaned, ready for reoccupancy Hazard - correct answer Deteriorated, friction/impact; chewing Lead inspector job description - correct answer Create lead reports Risk Assessors job description - correct answer Identify risk and make recommendations to abatement methods Abatement - correct answer Permanent removal of hazards (20 years) enclosure, encapsulation, removal, replacement, remove paint enclosure - correct answer Vinyl, paneling, drywall, luan, plywood, glued, screwed, chalked. NO WALLPAPER Encapsulation - correct answer Substrate must be stable and strong (fiberlock) Interim controls - correct answer Temporary, waiting for abatement (inspect every year) LBP location methods - correct answer XRF, dust sample, soil sample, paint chip sample Parts of window - correct answer Stop, sill, apron, header, parting bead, casing, trough, well Parts of door - correct answer Casing, jamb, hardware, threshold Parts of stairs - correct answer Treat, riser, spindle, newel post, balusters chewable - correct answer Between 6" and 4" - protrudes 1/2 " and is horizontal Lead sources - correct answer Pipes, water, paint, dust, soil, pottery, stained glass, toys, antiques
Document information
- Uploaded on
- July 24, 2024
- Number of pages
- 6
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers