• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 26 pages
Exam (elaborations)

Cmit Exam Newest 2024 Actual Exam 150 Questions And Correct Detailed Answers (Verified Answers) |Already Graded A+

Document preview thumbnail
Preview 3 out of 26 pages

CMIT EXAM NEWEST 2024 ACTUAL EXAM 150 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+

Content preview

CMIT EXAM

Terms in this set (200)

A 5D BIM model D) Cost
incorporates which project
attribute?
A) Schedule
B) Quality
C) Phasing
D) Cost

21. True
In a CM-at-Risk
arrangement once
construction begins and the
CM converts from the
professional advisory role
of a CM to the contractual
role of a general contractor,
the CM has no implied
duties of loyalty and care to
the owner.
True False

According to the CMAA True
agency series contract
documents, the CM and
designer are required to
cooperate for the benefit of
the owner.
True False

,Actual usage of a particular D) All of the above
contract form for the
construction phase
depends on:
A) The particular delivery
system being used.
B) The type of project being
implemented and the
completion status of the
plans and specifications at
the time of contracting.
C) The consideration of any
performance requirements,
the level of sophistication
of the owner, and the role
of the architect/engineers
involved.
D) All of the above

A/E services are required to False
be competitively bid under
the "Brooks Act."
True False

After a contractor declares B) Punchlist
that he is substantially
complete on a project, the
owner and/or CM should
prepare what document?
A) Bond release
B) Punchlist
C) Commissioning plan
D) Final payment

, After the owner accepts a False
CM's proposed GMP as
contemplated by the CMAA
CM-at-Risk Series
documents, the
responsibilities and duties
of the CM are essentially
the same as if the owner
and CM were using the AIA
GMP documents.
True False

The agency CM does not True
perform design or actual
construction work.
True False

Agency CM is a distinct set True
of services that can be
applied to any project
delivery method.
True False

The agency CM maintains a False
direct contractual
relationship with the trade
or prime contractors.
True False

An agency CM with a fixed False
fee compensation
arrangement shares in the
savings generated by a
lower than planned
construction cost of the
project.

Document information

Uploaded on
July 24, 2024
Number of pages
26
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$23.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheAlphanurse
4.2
(386)
Sold
5798
Followers
178
Items
6607
Last sold
5 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions