AC Exam #5 - Construction Doc with complete verified solutions
Pre-qualification The ________________________ process results in a select bidders list, or short list, which identifies firms that have demonstrated to the owner that they have the necessary abilities to perform the required work. General Conditions Often referred to as the boiler plate, the _____________________ augment the construction contract (agreement) and outline the rules under which the project will be built by establishing the rights, authority, and obligations of the contracting parties: the owner, the owner's representative, and the contractor. Incorporated by Reference What is the name of the law principle for referring the Contractor to other documents that are not contained in the package provided? General Conditions The ____________________ usually appear in pre-printed form and occasionally are included in the project manual by reference only. Whether bound in the project manual or by reference only, they should be readily available to the project team at all times. Instructions to Bidders This document states the conditions the owner or contracting authority has established for the form and content of the bids where and when it must be delivered, whether it is a public opening, etc? Addenda Issued during the bid period, this document is used to provide additional information that are germane to the contract documents. Information contained in this document is considered a part of the contract documents and requires the bidder to acknowledge receipt of on the bid form. Plans/Drawings The ________________ and project manual are considered a full set of bid documents. Non-Collusive Affidavit Submitted by each bidder with its bid/proposal, this document certifies that the bidder has not conspired with a competitor or other company to create an unfair advantage over other bidders. Failure to include this document with the bid/proposal will render the bid/proposal non-responsive and will result in its rejection. Technical Specifications The _________________________ , which relates to labor, material, equipment and procedures to accomplish the required construction, is usually divided into 49 diivisions per the CSI Masterformat (2004). General Requirements This portion of the technical specifications describes to the Contractor and the Subcontractors the project-related overhead items for which the costs are considered to be "direct overhead" or "general conditions". This division will relate to submittal requirements, construction schedule requirements, temporary facilities, etc. Supplementary Conditions Common examples of items included in this document consist of changes in the insurance requirements for a specific project, owner-provided equipment, etc. Proposal Supplements Which document requests that additional information be submitted by the bidder within 48 hours of bid opening? Prevailing Wage Rate Schedule Which document establishes the labor rates on a project? Stipulated Sum (Fixed Price) The AIA A101 - 2007 Standard Form of Agreement Between Owner and Contractor is designed for projects where the basis of payment is a _________________. Bid Alternates Usually described in the general requirements, ________________ are used by the owner as a means of ensuring a bid within limited financing or providing it the opportunity to make the most judicious selection of material finishes, additions and/or deletions of work scope. Cash Allowance Owners will occasionally require all bidders to include in their bid a specified amount or unit price for a particular item that cannot be defined and/or quantified at bid time. This is called a _________________. Information Available to Bidders Which document specifies the existing soil conditions? General Requirements Which document specifies the temporary facilities needed on a project? General Requirements Which document specifies the regulations required such as soil erosion or minorities? Proposal Form, Bid Breakdown, Addendum, Bid Bond & Noncollusive Affidavit Which of the following documents are submitted by the Contractor at bid opening? Escalator Clause Since large construction projects can take a significant time to complete, consideration should be given to possible increases in prices. A clause included in the contract that obligates the owner to pay for increases in the costs of materials and labor is called _________________. All are correct An agreement, in order to constitute a binding contract, must be entered into by competent parties who express definite assent in the form required by law. Furthermore, such an agreement must ......... The principle of Legal Capacity has not been met, therefore, a non-responsive bid The owner requests that you submit a proposal supplement titled "Statement of Contractors' Qualifications - All Contracts" and under the officers/principals section it requests the names and titles of the vice president and the president. A proposal is submitted to the Owner with a bid bond, signed addenda, and the proposal form is attached and signed by the chief estimator. Have all of the contract formation principles been satisfied and would the proposal be considered responsive? Promissory Estoppel Which of the following principles of law states that if the prime contractor reasonably relies on the promise or price of the subcontractor to its detriment, then the subcontractor must be held to its promise in order to avoid harm to the prime contractor even though a signed contract between the contractor and subcontractor does not exist at the bidding phase of a project? During the bidding phase of the project. At which point in time must the Agreement be provided to each prospective bidder? Notice to Proceed Which document establishes the reference date from which the beginning of the project is calculated and that the contractor can occupy the site? True An essential in the formation of a valid contract is mutual assent to the terms of the agreement. The manifestation of mutual assent usually takes the form of an exchange of oral or written words, a circumstance variously termed as offer and acceptance or meeting of the minds. promisor In a valid contract there must be a definite promisor and a definite promisee, each of whom is legally capable of playing the intended part of the in the proposed contractual arrangement. In a contract for construction services the general contractor is the ___________________. Payment & performance bonds, general conditions, specifications, contract change orders The basic relationships among various documents are classified as construction documents, bidding documents, project manual, and contract documents. Contract documents include the following items___________________________________. Bid security, insurance information, addenda and general conditions The basic relationships among various documents are classified as construction documents, bidding documents, project manual, and contract documents. Bidding documents include the following items___________________________________.
Document information
- Uploaded on
- July 13, 2024
- Number of pages
- 22
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers