• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

CM 1011 Final

Document preview thumbnail
Preview 2 out of 7 pages

Omer Hebert, who spoke on industrial estimating, works for what construction company? A. Performance Contractors B.Turner Industries C.Pala Construction D. The Lemoine Company E. None of the above - answer-B Which one of the following is typical on an industrial project? A. Industrial projects involve private clients. B. Industrial projects have a lengthy approval process. C. Bonds often are not required on industrial projects. D. Industrial construction companies used direct hire craft as opposed to subcontractors. E. All of the above are typical. - answer-E Which one of the following is NOT a requirement for success as an industrial estimator? A. Class room learning B. Experience C. Organizational skills D. Calculus E. All of the above are requirements for success as an industrial estimator. - answer-D Which one of the following is TRUE? A. RFQ stands for Request for Quotations B. QTO stands for Quantity Takeoff C. RFI stands for Request for Inquiry D. BID stands for Bid Includes Design E. All of the above are true. - answer-B Our guest lecturer, Marc Bourgeois, works for which construction company? A. Performance Contractors B. Turner Industries C. Regal Construction D. MMR E. MAPP - answer-C Which one of the following statements is FALSE? A. Public projects must be advertised. B. Private projects may be advertised. C. Private projects may use a select bid list. D. Private projects may be directly negotiated. E. All of the above statements are true. - answer-E Which one of the following statements is FALSE? A. A subcontractor may be solicited by a prime contractor to determine interest in a project. B. The most common way to distribute design documents is via U.S. mail. C. Pre-Bid conferences are very common on public projects. D. A contractor should always visit the site before submitting a bid. E. An addendum may be the owner's response to a bidder's RFI. - answer-B Which one of the following statements is FALSE? A. Bid rules are typically less formal on a private project. B. Public projects require a sealed envelope properly labeled.


Document information

Uploaded on
June 22, 2024
Number of pages
7
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TOPDOCTOR
5.0
(1)
Sold
10
Followers
5
Items
3387
Last sold
1 year ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.