Boilermaker test UPS 100% Correct!
When working on an exchanger tube side hydro test, the - ANSWERCHANNEL HEAD How many bolts need to be removed from a 12 bolt flange when installing gasket? - ANSWER5 One of the main factors to consider when installing an orifice plate is: - ANSWERDirection of flow When cutting a stud bolt, which end of the bolt should be saved? - ANSWER- STAMPED - STENCILED - MARKED The method of pulling and rigging out an exchanger bundle without equipment is called a CONVENTIONAL pull. - ANSWER- TRUE One of the most common internal components used to slow the f called a. DEMISTER_ pad. - ANSWER- TRUE Bundle straps should be aligned with the exchanger bundle BAFFLE plate when rigging an - ANSWER- TRUE SOFTENERS.. should be put into place when chokers come into contact with sharp surfaces or edges. - ANSWER- TRUE What are the two different classifications of manways on towers? - ANSWER- INTERNAL - EXTERNAL Which exchanger head is always absent on a u-tube bundle? - ANSWERFLOATING HEAD A pipe union has a flow direction. - ANSWER- TRUE To properly install an exchanger head and make sure the gasket seats properly you should: - ANSWERGlue gasket to the proper gasket surface, where the gasket will catch ou that gasket surface preventing it from rolling
Written for
- Institution
- Boilermaker
- Course
- Boilermaker
Document information
- Uploaded on
- June 21, 2024
- Number of pages
- 2
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
boilermaker test ups 100 correct
-
boilermaker test ups 100 correctstuvia
-
when working on an exchanger tube side hydro test
-
how many bolts need to be removed from a 12 bolt f
Also available in package deal