PTC - POSITIVE TRAIN CONTROL SYSTEM - PART II Qs&As
PTC - POSITIVE TRAIN CONTROL SYSTEM - PART II Qs&As 1 / 2 1. Trains operating with failed cab signals in PTC territory will be governed by rules.: Cab Signal Failure 2. TRUE OR FALSE: When the on-board PTC apparatus is cut out because of an en-route cab signal failure the PTC system will continue to enforce track speed limits, restrictions and signals displaying stop.: TRUE 3. TRUE OR FALSE: When the on-board PTC apparatus is cut out because of an en-route cab signal failure the system will continue to enforce Slow Speed, Medium Speed, Limited Speed, and Restricted Speed routes within Interlocking limits.: FALSE. Restricted Speed is a method of operation and not a speed 4. Positive Train Control (PTC) is a system that uses transponders and data radio to supplement what system?...
Written for
- Institution
- PTC
- Course
- PTC
Document information
- Uploaded on
- June 19, 2024
- Number of pages
- 2
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Also available in package deal