100% Correct Answers | 2024/2025
Basics covered in Level 1 - ___ Nuclear Testing
Speedy Moisture
Report Forms
Earthwork has to do with the roadway in what way? - ___ Earthwork is the excavation and
placement of soils and materials supporting the proposed roadway.
In Earthwork what is a lift? - ___ 6" of compacted depth at full width
In Earthwork what is a Lot? - ___ A lot is 1 lift at 500 ft or within compacted area. Isolated
compaction operations are separate lots.
Sampling at the roadway is done for - ___ Done for base, sub grade, and embankment.
The material identification number for embankment in the laboratory is - ___ 004L
The material identification number for embankment in the field is - ___ 004F
The material identification number for base is - ___ 030
Samples are collected by - ___ project personnel PP
Sampling in the field it is important to - ___ sample each type of material and have
enough for a representative sample
, When to secure samples - ___ After material is placed but before compaction effort is
applied
Sample transmittal card the source uses what code for the jobsite - ___ 08
For material description the minimum is always - ___ Color and texture
On sample bags be sure to put - ___ Project #
Sample #
Location
What is the document that itemizes the minimum requirements for sampling and testing? -
___ Sampling, testing, reporting guide
Unit weight is - ___ the weight of a material occupying a volume
Wet density - ___ is the weight of soil and water in a volume
Dry density - ___ weight of soil solids in a volume
Moisture content - ___ amount of water in the soil in the volume
The lot index and special conditions is for - ___ detailing verification pass or fails
All of the QC report forms - ___ same as the QC's but for VT's
The dry density on log in data sheets is - ___ the computed dry density calculated with
the speedy