• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

FDOT Earthwork Level 1 Exam Questions With 100% Correct Answers | 2024/2025

Document preview thumbnail
Preview 2 out of 9 pages

FDOT Earthwork Level 1 Exam Questions With 100% Correct Answers | 2024/2025 Basics covered in Level 1 - -Nuclear Testing Speedy Moisture Report Forms Earthwork has to do with the roadway in what way? - -Earthwork is the excavation and placement of soils and materials supporting the proposed roadway. In Earthwork what is a lift? - -6" of compacted depth at full width In Earthwork what is a Lot? - -A lot is 1 lift at 500 ft or within compacted area. Isolated compaction operations are separate lots. What is important about sampling at the roadway - -Minimum of three representative sample combined. What is LIMS? - -Laboratory Info Management System The proctor theory is when compaction is achieved how - -by inputting energy to expel air and water in the soil voids Compaction causes - -An increase in unit weight, decrease in compressibility and permeability. Sampling at the roadway is done for - -Done for base, sub grade, and embankment. Sampling is determined how - -generated with random numbers usually by a Verification Inspector The proctor is determined where and creates what - -In a laboratory and establishes a density standard to be used on the roadway Lab proctors are created how - -Material is gathered from the road and prepared with different amounts of water then placed in molds and hammered What is a modified proctor used in - -It is used in base, sub grade, MSE wall back fill materials Modified proctors are created how - -With a 10lb hammer(rammer) on a 18" drop with 56 blows per layers with 5 layers in total. What is a standard proctor used in - -It is used in embankment and structure back fill materials Standard proctors are created how - -With a 5.5lb hammer(rammer) on a 12" drop with 25 blows per layer with 3 layers in total Comparison between VT and QC density test tolerance - -2 lbs/pcf What is the STRG - -Sampling, T

Content preview

FDOT Earthwork Level 1 Exam Questions With 100%
Correct Answers | 2024/2025

Basics covered in Level 1 - -Nuclear Testing


Speedy Moisture


Report Forms


Earthwork has to do with the roadway in what way? - -Earthwork is the excavation

and placement of soils and materials supporting the proposed roadway.


In Earthwork what is a lift? - -6" of compacted depth at full width


In Earthwork what is a Lot? - -A lot is 1 lift at 500 ft or within compacted area.

Isolated compaction operations are separate lots.


What is important about sampling at the roadway - -Minimum of three representative

sample combined.


What is LIMS? - -Laboratory Info Management System


The proctor theory is when compaction is achieved how - -by inputting energy to

expel air and water in the soil voids


Compaction causes - -An increase in unit weight, decrease in compressibility and

permeability.


Sampling at the roadway is done for - -Done for base, sub grade, and embankment.

, Sampling is determined how - -generated with random numbers usually by a

Verification Inspector


The proctor is determined where and creates what - -In a laboratory and establishes

a density standard to be used on the roadway


Lab proctors are created how - -Material is gathered from the road and prepared with

different amounts of water then placed in molds and hammered


What is a modified proctor used in - -It is used in base, sub grade, MSE wall back fill

materials


Modified proctors are created how - -With a 10lb hammer(rammer) on a 18" drop

with 56 blows per layers with 5 layers in total.


What is a standard proctor used in - -It is used in embankment and structure back fill

materials


Standard proctors are created how - -With a 5.5lb hammer(rammer) on a 12" drop

with 25 blows per layer with 3 layers in total


Comparison between VT and QC density test tolerance - -2 lbs/pcf


What is the STRG - -Sampling, Testing, and Reporting Guide (state wide)


A job guide schedule is - -project specific


The material identification number for embankment in the laboratory is - -004L

Document information

Uploaded on
June 17, 2024
Number of pages
9
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MERCYTRISHIA
3.9
(43)
Sold
242
Followers
35
Items
14935
Last sold
20 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions