POM Exam 2 Questions and Answers | New One | Grade A+
A__________is a symbol used in process maps to denote an input or arrival into a process. Ans: A double-headed arrow In a process design, a__________is a specific unit of work required to create an output. Ans: Task Which of the following is a difference between flow shops and job shops? Ans: Job shops require frequent machine changeovers and delays. An automobile emissions testing center has three inspectors and tests 35 vehicles per hour. What should the service rate be in order to achieve a target utilization of 95 percent? Ans: more than 10 but less than or equal to 15 vehicles per hour The average number of hotel rooms occupied per day during the month of March is 225. On average, each room is booked for 2.5 days. What is the average number of new bookings that occur per day? Ans: more than 50 but less than or equal to 100 rooms per day An accounting firm is capable of processing 20 income tax forms per day. The average number of forms in various stages of processing at any one time in the firm is 64. What is the average processing time per income tax form? Ans: more than 3 but less than or equal to 4 days A car rental company at a major airport on an average rents 70 percent of its fleet of 200 cars per day. The cars are rented for an average of 4 days. What is the average number of rentals processed per day? Ans: more than 10 but less than or equal to 50 cars per day An automobile emissions testing center has six inspectors and tests 50 vehicles per hour. Each inspector can inspect 12 vehicles per hour. How many inspectors would the center require to have a target utilization of 90 percent? Ans: 5 The objective of assembly-line balancing is to: Ans: minimize the imbalance among workstations while trying to achieve a desired output rate.
Content preview
Document information
- Uploaded on
- June 16, 2024
- Number of pages
- Unknown
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers