• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

OSHA - Workzone Traffic Control

Document preview thumbnail
Preview 2 out of 9 pages

OSHA - Workzone Traffic Control

Content preview

OSHA - Workzone Traffic Control
Which of the following is a Fundamental Principle of Workzone Safety?

A. Create obstacles for traffic to navigate.
B. Place workers in the road.
C. Work during off-peak hours.
D. Direct traffic to ride the shoulders or off-road.A. - ANS-C. Work during off-peak hours.

OSHA requires that traffic and highway workers follow workzone safety lists provided by
the

A. Code of Federal Regulations (CFR)
B. Manual on Uniform Traffic Control Devices (MUTCD)
C. Department of Transportation (DOT)
D. None of the above. - ANS-B. Manual on Uniform Traffic Control Devices (MUTCD)

Construction and highway maintenance work is one of the most hazardous job duties in
the U.S.

A. True
B. False - ANS-A. True

To reduce the risk of workzone hazards, workers must be able to:

A. Anticipate hazards.
B. Recognize hazards.
C. Control hazards.
D. All of the above. - ANS-D. All of the above.

Which of the following is a workzone hazard?

A. Lane-change collisions.
B. Being struck by a vehicle.
C. Vehicles entering open trenches.
D. All of the above. - ANS-• D. All of the above.

A Traffic Control Plan should be kept simple to minimize confusion and the risk of
accident.

, A. True
B. False - ANS-A. True

The Transition Area usually begins of the Advanced Warning Area, and provides a zone
where traffic is tapered, or where lanes are closed.

A. In the middle.
B. At the end.
C. Before the start.
D. Two areas ahead. - ANS-B. At the end.

A Traffic Control Plan must address:

A. Motorists
B. Pedestrians
C. Workers
D. All of the above. - ANS-D. All of the above.

The will address traffic workzone hazards, controls, safe work
practices and procedures, notifications, training, emergencies, etc.

A. Permit
B. Traffic Control Plan
C. CER
D. None of the above. - ANS-B. Traffic Control Plan

The pathways of pedestrians and bicyclists should be separated from mainstream
traffic.

A. True
B. False - ANS-A. True

The purpose of the Buffer Zone is to provide an area where vehicles:

A. Can speed up.
B. Are separated from work activity.
C. Can pull over.
D. Stop until worker approval. - ANS-B. Are separated from work activity.

Document information

Study
Uploaded on
June 15, 2024
Number of pages
9
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$8.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Ace360PRO
4.7
(108)
Sold
262
Followers
3
Items
10566
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions