Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 1 out of 4 pages
Exam (elaborations)

FDOT Final Estimates - Level 1 || A+ Graded Already.

Document preview thumbnail
Preview 1 out of 4 pages

What two types of Estimates are needed to pay for the work performed by contractors? correct answers Final & Progress Monthly In case of discrepancies among the contract documents, which document takes the highest precedence? correct answers Special Provisions Contractors Recieve progress payments on the basis of? correct answers Monthly Progress Estimates Which of the following sets forth the Department's methods and procedures for preparing and checking final estimates? correct answers Preparation and Documentation Manual (PDM) Which Document contains a series of Specially designed forms that show both original estimates of quantities and the final quantities as measured ad accepted? correct answers Computation Books Which Document contains alignment notes, cross-section notes, linear and area measurements and dimension sketches? correct answers Field Notebooks Where are major changes during construction documented and "as-built" conditions shown? correct answers Field Notebooks What identification is needed to show on the front cover of a field book? correct answers FEID, Contract number, General contents of the book When making corrections to a field book entry, you should: correct answers strike through, initial and enter correct data and date What should be started on the first lined page (page 1) of a field book? correct answers INDEX An entire page of a field notebook you are using is incorrect, what do you do to correct the situation? correct answers Mark the page VOID and reference it to a new page showing the correct information. "Check Levels" must be run at the start of a construction project to assure that: correct answers Construction will be done to design elevations & final measurements for payment will be from the same base elevations as the original survey. What should accompany final measurements so that nonstandard measurements may be interpreted accurately? correct answers Sketches In the REMARKS column of most computation book forms a reference should be made to the: correct answers Source Documents


Document information

Uploaded on
June 13, 2024
Number of pages
4
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$10.69

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SirAnton
3.7
(118)
Sold
792
Followers
438
Items
40101
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.