,Splices in rall tracks shall have - ✔✔✔ANSWER-Smooth
Joints
Hydraulic systems should have their proper fluid level
checked - ✔✔✔ANSWER-Daily
If power fails during operations, the following shouldn't apply
- ✔✔✔ANSWER-Do your best to finish moving load where it
was designated to go
If load is undetermined who is to find out if load weight does
not exceed crane rating at radius at which the load is to be
lifted - ✔✔✔ANSWER-Person responsible for lift
Where should climbing instructions be kept -
✔✔✔ANSWER-ON Site
All climbing operations shall be performed under the
supervision of - ✔✔✔ANSWER-Qualified person
, When cranes are erected, load limiting devices shall be
tested for proper setting and operation - ✔✔✔ANSWER-
Before crane is placed in service
Hooks shall be equipped with latches unless the application
makes the use of the latch - ✔✔✔ANSWER-Impractical
Size and position of signs or panels must satisfy the
limitations of - ✔✔✔ANSWER-Manufacturer
Fall prevention measures are needed for working at
locations where you are exposed - ✔✔✔ANSWER-To a fall of
6ft or more
Travel distance on hand levers shall not be greater -
✔✔✔ANSWER-than 14 inches from neutral position
For power lines rated 175KV the minimum clearance
between the lines and any part of the crane or load is -
✔✔✔ANSWER-15ft