Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 13 pages
Exam (elaborations)

NCCCO Tower Crane EXAM ACTUAL EXAM 100 QUESTIONS AND CORRECT DETAILED ANSWERS ANSWERS ALREADY GRADED A FINAL UPDATE PASS A+

Document preview thumbnail
Preview 2 out of 13 pages

NCCCO Tower Crane EXAM ACTUAL EXAM 100 QUESTIONS AND CORRECT DETAILED ANSWERS ANSWERS ALREADY GRADED A FINAL UPDATE PASS A+ Splices in rall tracks shall have - ANSWER-Smooth Joints Hydraulic systems should have their proper fluid level checked - ANSWER-Daily If power fails during operations, the following shouldn't apply - ANSWER-Do your best to finish moving load where it was designated to go If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be lifted - ANSWER-Person responsible for lift Where should climbing instructions be kept - ANSWER-ON Site All climbing operations shall be performed under the supervision of - ANSWER-Qualified person When cranes are erected, load limiting devices shall be tested for proper setting and operation - ANSWERBefore crane is placed in service Hooks shall be equipped with latches unless the application makes the use of the latch - ANSWER-Impractical Size and position of signs or panels must satisfy the limitations of - ANSWER-Manufact

Content preview

NCCCO Tower Crane EXAM
2023-2024 ACTUAL EXAM 100
QUESTIONS AND CORRECT
DETAILED ANSWERS
ANSWERS ALREADY GRADED
A+

, On a Tower crane what diameter of the load hoist drum shall
be sufficient to provide a first layer rope pitch diameter of
not less than ? - ✔✔✔ANSWER-18 times the nominal
diameter of the rope


According to OSHA 1926.1435 , how often must the
turntable and tower bolts be inspected for proper torque and
condition ? - ✔✔✔ANSWER-Annually


Which of the OSHA Subparts regulates personnel platforms
suspended from cranes used in construction ? -
✔✔✔ANSWER-Subpart CC


According to OSHA 1926.1431 , when proof testing a
personnel platform how long must the load remain
suspended ? - ✔✔✔ANSWER-5 minutes


According to OSHA , when lifting personnel in a platform the
cranes hook must be the type that : - ✔✔✔ANSWER-Can be
closed and locked

Document information

Uploaded on
June 7, 2024
Number of pages
13
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$21.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BEST100
4.4
(18)
Sold
55
Followers
35
Items
1120
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions