,shift left - ✔✔✔ANSWER-intense efforts to establish scope
early in the process; drives early team formation to include
key trade subcontractors; can enable big decisions to be
made early, affect project outcomes at lowest cost,
establish a need for co-location and collaboration, and
compress time during concurrent design and construction
designer of record (a/e) - ✔✔✔ANSWER-licensed to protect
health, safety, and welfare of the public, leads the overall
design effort, or design and engineering of a specific
discipline
design manager - ✔✔✔ANSWER-facilitates "marriage"
between design professionals and cost estimators,
advocates for design excellence within the design-build
team, and manages the design information flow and
deliverables
estimator - ✔✔✔ANSWER-must be in step with the designer
from start to finish; receives assistance from key trade
partners
Project Delivery System - ✔✔✔ANSWER-How team
members are organized, establishes when parties engage,
, determines roles of parties, and determines sequence of
design, procurement, and construction (db, cmar, dbb)
Procurement Method - ✔✔✔ANSWER-how team members
are selected (QBS, best value, low price, sole source)