• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

Gcss Terms With Complete Solutions

Document preview thumbnail
Preview 2 out of 11 pages

GCSS TERMS WITH COMPLETE SOLUTIONS Bill of Materials (BOM): - Answer-A Bill of Material is a complete, formally structured list of the components that makes up a product or assembly. A BOM represents a parent/child relationship between a weapon system or end item, its assemblies, its subassembly components, together with the item number, quantity and unit of measure. Business Workplace (SBWP): - Answer-The GCSS-Army internal communications network consisting of an EMAIL capability and a WORKFLOW messaging structure. The WORKFLOW process is used to send transactions to Materiel Managers for review. Business Workplace (SBWP) Legacy equivalent is: - Answer-Manager Review File (MRF). Company Code-Army - Answer-Identifies tactical Army as an organization for logistics and financial accounting. Customer Master - Answer-Contains critical customer information relating to accounts and locations and unique information about customer sets. Included are agency data required to conduct logistics processes, such as Department of Defense Automatic Addressing Codes (DODAACs), Unit Identification Codes (UICs), and geographic data. Equipment Master - Answer-Equipment Master is the representation of an individual asset or component in GCSS-Army. It contains the data necessary to store and maintain the description and specifications for the item and perform relevant maintenance activities. Included are critical serial numbers for air and ground systems, as well as selected sets of critical components such as critical air safety items. Force Element (FE) - Answer-An organizational object, or element (such as a Brigade/Regiment, Troop/Battery/Company, Platoon, or Squad/Section), that is uniquely identified and is part of the GCSS-Army organizational structure. This structure is defined by the Modified Table of Organization and Equipment and the Table of Distribution and Allowances (MTOE/TDA). In addition to a long-text title, each FE has a system-generated, eight-digit object ID number and is assigned a UIC-based unit abbreviation. Inbound Delivery - Answer-Inbound deliveries are created from purchase orders and stock transport orders as a notification and record that an item has been shipped. Material - Answer-An item of supply or property. Material Number - Answer-The material number is uses by the customer to order supply or property. Material Number Legacy equivalent: - Answer-Stock number or part number. Material Planning Object (MPO) - Answer-Non-expendable items of equipment are identified in GCSS-Army as material planning objects (MPO). An MPO number is created for each piece of equipment. This number remains with the equipment throughout its life cycle. LINs are the building blocks for MPOs. Material Requirements Planning (MRP) - Answer-A process within GCSS-Army that calculates the quantities needed to satisfy projected consumption or to meet immediate requirements. The planned and the exact requirements quantities trigger the net requirements calculation. The system calculates net requirements for all materials that are to be planned. Material Planning Object (MPO) Legacy equivalent: - Answer-Requirements Determination, Net Asset Computation. Material Reservation - Answer-A request or instruction to procure a quantity of a material so that it is available at a specific time. Movement Type - Answer-A three digit code that identifies the reason and type of material movement that is being conducted in GCSS-Army. MRP Area - Answer-The virtual instance where materials are planned identified by a Force Element number followed by an: UNDERBAR P (_P) indicating Provision/Consumable, UNDERBAR S (_S) indicating Stock/Property Book item MRP Planning Run - Answer-The running of a series of batch jobs in order to execute the Materiel Requirements Planning process. MRP Type - Answer-Defines how a material will be planned. GCSS-Army uses the following: PD - Material Requirements Planning, , VV - Forecast-based Planning, ZM - Mandatory with Safety Stock, ZP - Provisional with Safety Stock, ZV - ROP with All Requirements, ND - No Planning MRP Type Legacy equivalent: - Answer-Stockage List Code (SLC). Notification - Answer-A notification is the alert process that informs an end user that some type of action is required for Army equipment. Outbound Delivery Monitor (OBD) - Answer-A GCSS-Army process that allows a manager to view of all Outbound Deliveries. Outbound Deliveries are goods placed into customer bins for pickup or staged for delivery. Plant 2000 or 2001 - Answer-A data element used to designate the financial category of material. Plant 2000 is Operation and Maintenance Activity (OMA) and is used to identify all items in organizational Supply. Plant 2001 is Army Working Capital Fund (AWCF) which is items in the Retail Supply System. Post Goods Issue (PGI) - Answer-The issuing of supplies to a customer or external vendor. Provisions - Answer-Provisions are used for the planning of consumable items that a Unit needs to perform its tasks and missions. Examples of Provision usage are Shop Stock, ASL and Basic Load. Purchase Order (PO) Document Types - Answer-A TWO digit character code (45) used to Identify the type of Purchase Order transaction being performed. Purchase Requisition (PR) - Answer-A request from a customer to a supplier (PBO, SSA or External Vendor) to deliver a quantity of material or to perform services at a given point in time, before converting the PR to a Purchase Order (PO). Standard Unit of Measure - Answer-Specifies which unit of measure is used for calculations in the MRP list and the stock/requirements list. Stock - Answer-Non-expendable items of equipment identified in GCSS-Army as Material Planning Objects (MPO). An MPO number is created for each piece of equipment. Stock Transport Order (STO) - Answer-Used to transfer stock from plant to plant or storage location to storage location. Stock Transport Orders are used for bin-to-bin movements within the same storage location. Storage Location - Answer-Physical location where inventory is stored or virtual location where inventory is planned. Supersession Chain (SSC) - Answer-In GCSS-Army, all substitute parts are part of a supersession chain (SSC). The SSC lists the prime number and valid substitutes within that chain. Supersession Chain (SSC) Legacy equivalent: - Answer-Interchangeability and Substitutability (I&S).


Document information

Uploaded on
June 5, 2024
Number of pages
11
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$14.69

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
wisdompoint
3.7
(20)
Sold
120
Followers
66
Items
5730
Last sold
4 months ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.