DBIA: Principles of Design-Build and Post Award & Contracts Test 100% VERIFIED SOLUTIONS 2023//2024
DBIA: Principles of Design-Build and Post Award & Contracts Test 100% VERIFIED SOLUTIONS 2023//2024 Miller Act 1935 - ANSWER Federal Government passed bond requiring payment and performance bonds on all public works, what year? Brooks Bill 1972 - ANSWER Bill directing A/E's selected on qualifications, what year? Clinger Cohen Act/Defense Procurement Reform Act 1996 - ANSWER Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing Design-Build. Standard of Care - ANSWER The level of quality that any average Design Professional would be able to perform given the circumstances. Design Bid Build - ANSWER Slowest Project Delivery method, linear in nature, prescriptive (owner knows what they want), Multi Prime - ANSWER Project Delivery - Many contracts through Owner CM at Risk - ANSWER Project Delivery method allowing the contractor to come on board very early in design for preconstruction services yet maintains separation between Designer and Builder contractually. Design Build - ANSWER Fastest Project Delivery method, fast tracking possible overlapping design with construction utilizing incremental packages. Low Bid - ANSWER Procurement Method - Most Familiar Negotiated (Qualifications Based) - ANSWER Procurement Method - Common for A/E Best Value - ANSWER Procurement Method - Qualifications and Price Sole Source - ANSWER Procurement Method - Direct Lump Sum - ANSWER Contract Format w/ agreed upon fixed price Cost Plus Fee - ANSWER Contract Format - contractor reimbursed for actual cost plus an agreed upon percentage GMP (Guaranteed Maximum Price) - ANSWER Contract Format - Combines Cost-Plus & Lump-Sum, contractor reimbursed for actual cost plus a fee only up to a certain amount. Unit Price - ANSWER Contract Format - cost per piece Target Price - ANSWER Contract Format - established cost/benchmark determined jointly by project team. Trust, Flexibility - ANSWER Successful Design Build requires _____ & _______ between participants Hammurabi - ANSWER Singular responsibility for both design & construction was first codified by ____ Bridging Documents - ANSWER Owner provided items such as 20% design or more and provides prescriptive specs at RFP. Spearin Doctrine - ANSWER Owner is responsible for implied warranties in the sufficiency of the specifications. Performance Requirements - ANSWER ____ ____ should identify end results.
Document information
- Uploaded on
- May 28, 2024
- Number of pages
- 9
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers