• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 14 pages
Exam (elaborations)

PMG201 Course 1 Study Guide Test.

Document preview thumbnail
Preview 2 out of 14 pages

PMG201 Course 1 Study Guide Test. 1.True or False: A Project is defined as being unique and temporary, with an undefined start and finish. A.True B.False - CORRECT ANSWER B 2.We discussed three types of matrix organizations, they are: A.Light, Mid-strength and Strong B.Weak, Balanced and Strong C.Light, Medium and Heavy D.Weak, Medium Strength and Strong - CORRECT ANSWER B 3.In a projectized organization: A.Team members are never assigned to the project full time. B.A project manager is not assigned to the team. C.The functional manager has all of the power. D.The project manager acts as manager of the team. - CORRECT ANSWER D 4.True or False: The best organization to use to run a project will always be the projectized organization. A.True B.False - CORRECT ANSWER B 5.The five project management process groups as described in the PMBOK® Guide and discussed in the preceding lesson are: A.Initiating, planning, executing, monitoring and controlling, closing B.Kickoff, requirements, plan, schedule, control C.Requirements, design, development, testing, implementation D.Define, measure, analyze, improve, control - CORRECT ANSWER A 6.The three components of the triple constraint are: A.Scope, Cost, Time B.Scope, Performance, Time C.Scope, Quality, Cost D.Scope, Performance, Cost - CORRECT ANSWER A 7.You have finished planning and have begun executing the project when the client asks if you would add some important features to the product of the project. How are the triple constraints affected? A.Time and cost may both be affected B.Scope and quality would be affected but not cost C.Adding features will require additional cost but not time D.Cost must remain constant because resources are limited - CORRECT ANSWER A 8.The primary role of the project manager is: A.Distributing work packages B.Project initiation C.Communication D.Measuring performance - CORRECT ANSWER C


Document information

Uploaded on
May 26, 2024
Number of pages
14
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$11.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ROSEGRADES
3.4
(35)
Sold
236
Followers
87
Items
12121
Last sold
2 weeks ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.