Mobile Cranes 3 Questions & Answers | 100% Correct Answers | Verified | Latest 2024 Version
All slings for rigging they must have? - Sling identification While performing a shift inspection which one of these are required to be inspected as per OSHA 1926.1412 - Pins, bearings, and locking devices for significant wear. What is the signal person directing the crane operator to do? (Picture of man holding his arm straight out to his side, parallel to ground with his palm facing down). - Stop What does 4 x 12,920 equal? (no calculator) - 51,680 What is the signal person directing the crane operator to do? (Man holding his arm out and his forefinger is pointing left) - Swing left (See picture on sheet) What does 89,685 divided by 9 equal? (no calculator) - 9,965 Which of the following is the best definition of gross load? - The weight of the load plus other items, such as the hook block, rigging, etc. According to the ASME B30.5 what person is required to perform the frequent inspection? - Designated When is it NOT necessary to perform a trial lift for personnel platform use? - New personnel working in platform Which of the following does not need to be done prior to hoisting personnel? - Reduction of 25% applied to the load/capacity chart.When picking a piece of I-beam what is the best
Document information
- Uploaded on
- May 25, 2024
- Number of pages
- 11
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers