Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

WV LICENSING Exam with Complete Solutions

Document preview thumbnail
Preview 2 out of 8 pages

WV LICENSING Exam with Complete Solutions Construction projects are defined by which three factors? - Answer -1. Scope 2. Budget 3. Schedule In a traditional design/bid/build (D/B/B) project, a project's life cycle will begin with what? - Answer - D/B/B BEGINS WITH THE INITIATION OF PLANNING AND DESIGN What are the major duties of Construction Manager? - Answer -CONSTRUCTION MGR (CM) AKA CONSTRUCTION PROJECT MANAGER (CPM) : PLANS - DIRECTS - BUDGETS - MANAGES PROJECT COMPARE THE ENGINEERING AND DESIGN SPECIFICATIONS TEAM WITH THE FIELD SITE MANAGEMENT TEAM? - Answer -ENGINEERING AND DESIGN TEAM: ESTABLISHES DESIGN AND CONTRUCTION SPECIFICATIONS. FIELD SITE MGT TEAM: OVERSEES ALL ASPECTS OF CONSTRUCTION ON SITE TO ENSURE THAT WORK IS ACTUALLY PERFORMED IN ACCORDANCE WITH ENGINEERING PLANS AND SPECIFICATIONS WHO IS THE MOST IMPORTANT PERSON FOR THE SUCCESS OR FAILURE OF A CONSTRUCTION PROJECT AND WHY? - Answer -THE PROJECT MGR (PM) IS THE MOST IMPORTANT PERSON FOR THE SUCCESS OR FAILURE OF A CONSTRUCTION PROJECT AS HE HAS FULL AUTHORITY FROM THE MANAGEMENT OF THE ORGANIZATION TO MOBILIZE THE NECESSARY RESOURCES TO COMPLETE A PROJECT AND CAN EXERT INTERPERSONAL INFLUENCE IN ORDER TO LEAD THE CONSTRUCTION PROJECT TEAM. WHAT IS THE FINAL STEP IN MANAGING A PROJECT DEVELOPMENT PROCESS? - Answer -FORMALLY DOCUMENT THE AUTHORIZATION OF THE PROJECT WHAT IS A PROJECT REQUIREMENTS DEFINITION (PRD) FOR? - Answer -PRD REFINES AND DETAILS THE PROJECT AUTHORIZATION AND DETAILS WHAT THE PROJECT IS REQUIRED TO ACCOMPLISH AND THE RELEVANT SCOPE OF WORK. WHAT IS THE PURPOSE OF A SCOPE OF WORK (SOW)? - Answer -SOW DESCRIBES THE OVERALL PROJECT PURPOSE AS WELL AS OTHER SPECIFIC OBJECTIVES OF THE REQUIREMENT, WITH THE AIM OF HELPING THE CONTRACTOR UNDERSTAND THE MAGNITUDE OF THE ANTICIPATED EFFORT. WHAT IS THE USE OF CPM? - Answer -CPM CAN BE


Document information

Uploaded on
May 22, 2024
Number of pages
8
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
mercylynneh
3.6
(55)
Sold
300
Followers
13
Items
13251
Last sold
2 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.