Maryland Asbestos exam |75| questions with complete solutions
Maryland Asbestos exam |75| questions with complete solutions The lean ratio of an extension ladder -Correct Answer-4:1 According to AHERA, to complete a response action of a non-NESHAP size project, how many samples must be taken with results of what? -Correct Answer-5 samples taken inside with results of each 0.0 f/cc What are the notification requirements in Virginia? -Correct Answer-20 calendar days for any project greater than 10 sq feet or linear feet In what jurisdiction do individuals need an asbestos supervisor or working linsense -Correct Answer-Need a license everywhere Type of bond that would ensure that the general contractor will compensate subcontractors for labor and materials -Correct Answer-Performance Bond Minimum respiratory protection on a class 1 asbestos project with no NEA -Correct Answer-Full face air purifying respirator What is the maximum content permitted in the work area where an air purifying respirator is being worn? -Correct Answer-23.5% Chest XRays must be evaluated by what class reader? -Correct Answer-Class B What is the APF for a full face air purifying respirator -Correct Answer-50 Friable ACM is any material that can be: -Correct Answer-Crushed, pulverized, reduced to powder by hand pressure when dry The OSHA permissible exposure limit is -Correct Answer-0.1 f/cc over 8 hours TWA According to ASHERA, how many air samples must be taken for final clearance for NESHAP size project? -Correct Answer-13 samples (5 inside, 5 outside, 2 fields blanks , one sealed blank)TEM Laboratories that perform PLM and TEM must be accredited by -Correct Answer-National Voluntary Laboratory Accreditation Program AHERA is for -Correct Answer-Public schools K-12 What is the notification requirement for asbestos projects in DC -Correct Answer-10 working days prior to start NESHAP size projects and any project over 18 square feet of flooring. Building owner to notify tenants no less than 30 days prior to start of the project in writing What is a NESHAP sized project -Correct Answer-160 square feet, 260 linear feet, or 35 cubic feet The competent person must inspect the work suits of the crew at least: -Correct Answer-Once a shift In Maryland, the asbestos project notification must be posted when and where? -Correct Answer-Three days prior to any asbestos project, at all entrances and exits from the work site. NESHAP regulations provide definitions for -Correct Answer-Renovations, Adequately Wet, and Demolitions The definition of PACM is -Correct Answer-TSI and surfacing material found in a building constructed no later than 1980 The OSHA Asbestos in construction standard required employees to maintain exposure monitoring results for how many years? -Correct Answer-30 years What is the safe level of asbestos exposure? -Correct Answer-There is no safe limit
Document information
- Uploaded on
- May 20, 2024
- Number of pages
- 7
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers