SAFe Scrum Master 5.1 Study Guide with complete solutions
SAFe Scrum Master 5.1 Study Guide with complete solutions During PI planning who owns the planning of stories into iterations? -Correct Answer-Agile teams Who commits to the Iteration goals at the end of Iteration planning? -Correct Answer-Team Becoming a coach requires a shift from old behaviors to new ones. What are three examples of old behaviors? - Focusing on deadlines - Focusing on business value delivery - Asking the team for the answers - Driving toward specific outcomes - Fixing problems for the team - Facilitating team problem solving -Correct Answer-Not sure which 3 What are 2 critical areas that differentiate agile from the waterfall development -Correct Answer-incremental delivery of value and fast feedback Which type of enabler does a System Architect review during a System Demo? -enabler epics -enabler stories -enabler features -enabler capabilities -Correct Answer-not sure Why do teams have an iteration Retrospective? -Correct Answer-To Adjust and identify ways to improve Which demo is performed in the IP iteration -Correct Answer-The PI System Demo What are two good scrum master facilitation practices -Correct Answer-Create an environment of safety so that everyone feels comfortable contributing to the discussion Ensure all voices are heard Each PI planning meeting evolves over time, and ending PI planning with a Retrospective will help to do what? -Correct Answer-Continuously Improve the event The business must depend on the team for what in order to do any meaningful planning -Correct Answer-Commitment to the plan What is the purpose of the plan-do-check-adjust cycle as applied to iterations -to give the art team members a process tool to keep the train on the tracks -to create a continuous flow of work to support the delivery pipeline (not this one) -to provide a regular, predictable development cadence to produce an increment of value -to allow the team to perform some final backlog refinement for upcoming iteration planning -Correct Answer-not sure When does the Plan-Do-Check-Adjust cycle occur in Scrum? -Correct Answer-Across all scrum events Which statement is true about teams? -Correct Answer-Teams are more productive than the same number of individuals What is this statement describing "agile teams continuously adapt to new circumstances and enhance the methods of value delivery." -Correct Answer-Continuous Improvement What is one responsibility of a safe scrum master -Correct Answer-Facilitating an effective team breakout session during PI Planning What is the recommended frequency for PI planning in safe -Correct Answer-8-12 weeks What are the three pillars of scrum -Correct Answer-transparency, inspection, and adaptation
Document information
- Uploaded on
- May 18, 2024
- Number of pages
- 5
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers