ACI- CONCRETE FIELD-TESTING TECHNICIAN - GRADE 1 EXAM QUESTIONS AND VERIFIED ANSWERS WITH COMPLETE SOLUTIONS GRADED A+ Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. A. True B. False B. False ASTM C172 - Para (4.1)- The elapsed time shall not exceed 15 min. between obtaining the first and final portions of the composite sample. Q3. The composite concrete sample must be protected from sun, wind, contamination and rapid evaporation. A. True B. False A. True ASTM C172 - Para (4.1.2) Q4. If the concrete contains aggregates larger than those that are appropriate for a size of mold or equipment used, the sample should be wet sieved before making the test. A. True B. False A. True ASTM C172- Para (6.1) Q5. The composite sample should not be remixed before beginning any tests. A. True B. False B. False ASTM C172-Para (4.1.1) -The sample shall be combined and remixed with a shovel the minimum amount necessary to ensure uniformity and compliance with the maximum time limits Q6. Sampling should normally be performed, as the concrete is discharged from the mixer. A. True B. False B. False ASTM C172-Para (5). NOTE 2—Sampling should normally be performed as the concrete is delivered from the mixer. To the conveying vehicle used to transport the concrete to the forms; however, specifications may require other points of sampling, such as the discharge of a concrete pump. Q7. ASTM Method C172 includes sampling from stationary mixers, paving mixers, truck mixers, agitators, and non-agitating equipment. A. True B. False A. True ASTM C172- Para (1.1) Q8. After sampling is completed, start the tests for slump and air content within: A. 2 ½ minutes B. 10 minutes C. 15 minutes D. None of the above D. None of the above ASTM C172- Para (4.1.2) Start tests for slump, temperature, and air content within 5 min after obtaining the final portion of the composite sample. Q9. In any case, do not obtain samples until: A. All the water and admixtures have been added to the concrete B. 200 revolutions of the drum have been obtained C. ½ of the water has been added D. None of the above A. All the water and admixtures have been added to the concrete.

Content preview

ACI- CONCRETE FIELD-TESTING TECHNICIAN - GRADE 1 EXAM
QUESTIONS AND VERIFIED ANSWERS WITH COMPLETE
SOLUTIONS GRADED A+


Q1. Start molding specimens for strength tests within 30 minutes after fabricating
the composite sample.


A. True
B. False
B. False


ASTM C172 -Para (4.1.2) - Start molding.
specimens for strength tests within 15 min after fabricating the
composite sample.
Q2. The maximum allowable time between obtaining the first and last portions of
the composite sample may not exceed 5 minutes.


A. True
B. False
B. False


ASTM C172 - Para (4.1)- The elapsed time shall not exceed 15 min. between obtaining
the first and final portions of the composite sample.
Q3. The composite concrete sample must be protected from sun, wind,
contamination and rapid evaporation.

,A. True
B. False
A. True


ASTM C172 - Para (4.1.2)
Q4. If the concrete contains aggregates larger than those that are appropriate for
a size of mold or equipment used, the sample should be wet sieved before
making the test.


A. True
B. False
A. True


ASTM C172- Para (6.1)
Q5. The composite sample should not be remixed before beginning any tests.


A. True
B. False
B. False


ASTM C172-Para (4.1.1) -The sample shall be combined and remixed with a shovel the
minimum amount necessary to ensure uniformity and compliance with the maximum
time limits
Q6. Sampling should normally be performed, as the concrete is discharged from
the mixer.


A. True
B. False
B. False


ASTM C172-Para (5). NOTE 2—Sampling should normally be performed as the

,concrete is delivered from the mixer.


To the conveying vehicle used to transport the
concrete to the forms; however, specifications may require other points of sampling,
such as the discharge of a concrete pump.
Q7. ASTM Method C172 includes sampling from stationary mixers, paving mixers,
truck mixers, agitators, and non-agitating equipment.


A. True
B. False
A. True


ASTM C172- Para (1.1)
Q8. After sampling is completed, start the tests for slump and air content within:


A. 2 ½ minutes
B. 10 minutes
C. 15 minutes
D. None of the above
D. None of the above


ASTM C172- Para (4.1.2) Start tests for slump, temperature, and air content within 5
min after obtaining the final portion of the composite sample.
Q9. In any case, do not obtain samples until:


A. All the water and admixtures have been added to the concrete
B. 200 revolutions of the drum have been obtained
C. ½ of the water has been added
D. None of the above
A. All the water and admixtures have been added to the concrete.

, ASTM C172- Para (5.2.3). In any case do not obtain samples until after all of the water
has been added to the mixer.
Q10. No samples shall be taken before_________ or after_________ of the batch
has been discharged.


A. 10% or after 90%
B. 20% or after 90%
C. 20% or after 80%
D. None of the above
A. 10% or after 90%


ASTM C172- Para (5.2.1).


NOTE 3—No samples should be taken before 10 % or after 90 % of the batch has been
discharged.


Due to the difficulty of determining the actual quantity of concrete discharged, the intent
is to provide samples that are representative of widely separated portions, but not the
beginning and the end of the load.
Q11. When strength tests are to be made, the minimum size of the composite
sample shall be:


A. ¼ cubic foot
B. 1 cubic foot
C. Any convenient size
D. 1 Wheelbarrow
B. 1 cubic foot


ASTM C172- Para (5.1).


Make the samples to be used for strength tests a minimum of 28 L (1 ft3).

Document information

Uploaded on
May 11, 2024
Number of pages
43
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
TheBest01
3.0
(1)
Sold
4
Followers
2
Items
138
Last sold
1 year ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions