CDT Practice Delivery Study Guide Exam latest update
CDT Practice Delivery Study Guide Exam latest update m2-Which of the following is not a construction schedule milestone: a) submittal approval b) Project Delivery and team selection process c) Procurement (Bidding/negotiating/purchasing) Activities. d) Contract Completion - CORRECT ANSWER-Project Delivery and team selection process m6-If a date to proceed is not stipulated in the agreement, the owner should issue to the contractor a: - CORRECT ANSWER-Notice to Proceed m6-Pre-construction Activities Begin when the contractor has receivedL - CORRECT ANSWER-A Letter of Intent to Award m6-Which of the following is not a mobilization and Start up cost - CORRECT ANSWER-Royalties, Licenses and Fees m6-It is important to establish the site conditions prior to: - CORRECT ANSWERmobilization m6-Mobilization typically occurs after: - CORRECT ANSWER-Receipt of a notice to proceed and following a reconstruction meeting m6-Which two types of bonds might be required during construction - CORRECT ANSWER-Performance Bond and Bid Bond m6-Inspections are done by the AHJ to determine if the construction complies with - CORRECT ANSWER-Codes and Regulations m6-The contractor Should being Preparation and Delivery for the Pre-construction Submittals after which Event - CORRECT ANSWER-Execution of Agreement m6-Payment and Performance bonds are which type of document - CORRECT ANSWER-Pre-construction Submittal m6-It is important for subcontract and purchase order documents to reference the - CORRECT ANSWER-contract documents m6-Which two Parties are responsible for submittal of a set of construction documents tot he AHJ for permit review - CORRECT ANSWER-Owner and Architect m6-What is typically the contractor's first activity on the project site - CORRECT ANSWER-Mobilization m7According to the AIA A201 The contractor has sole responsibility and control over the following construction activities - CORRECT ANSWER-Means, methods, techniques, sequences, procedures, coordination, job site safety m7The responsibility of inspecting work already performed for proper conditions to receive subsequent work lies with the - CORRECT ANSWER-Contractor M7- The contractor's superintendent: - CORRECT ANSWER-Can not be changed without the owners consent and communication is as binding as if given by the contractor m7- True or False - by executing the contract the contractor confirms that the contract time is reasonable - CORRECT ANSWER-True m7- The date of substantial completion is established by the - CORRECT ANSWERA/E `m7- Under A201 who has the responsibility to pay sales, consumer, use and similar taxes for the work provided? - CORRECT ANSWER-contractor m-7If the contractor is delayed in the progress of the work by the owner the contractor should: - CORRECT ANSWER-Write the A/E requesting a change order granting an extension of time. m7- Product equivalency, manufacturer, installation, operating cost, maintenance costs, and warranty are major factors to be considered for: - CORRECT ANSWERSubstitution Request m7- All of the following my be accomplished through issuing change order except which one? a) Change in bid date. b)Decr
Written for
- Institution
- CDT
- Course
- CDT
Document information
- Uploaded on
- May 6, 2024
- Number of pages
- 12
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
cdt practice delivery study guide exam latest upd
-
m6 if a date to proceed is not stipulated in the a
-
m6 what is typically the contractors first activi
-
m7true or false acceptance of final payment cons
Also available in package deal