WALMART - STORMWATER EXAM 2024 WITH 100% CORRECT ANSWERS
WALMART - STORMWATER EXAM 2024 WITH 100% CORRECT ANSWERS The 1970's law that set into place the regulation of stormwater is: - correct answer The Clean Water Act Requirements for managing stormwater activity on a construction site are outlined in the following regulation: - correct answer NPDES Which of the following is never an allowable stormwater discharge from a construction site? - correct answer Discharge from contaminated groundwater The Notice of termination can filed when: - correct answer All construction activity, inside and outside the building, is complete and permanent stabilization verified Relative to stormwater permitting, all of the following must occur before construction starts except: - correct answer Submit the notice of termination (NOT) Which erosion control best mgmt practice increases water infiltration, dissipates rainfall energy and slows overland flow of stormwater - correct answer Vegetation Of the following factors that influence erosion rates, the one a contractor has the most control over is: - correct answer Groundcover
Document information
- Uploaded on
- May 4, 2024
- Number of pages
- 3
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers