SWPPP study guide 100% VERIFIED!
Law set into place in 1970 for storm water regulation - ANSWERSClean Water Act Regulations for monitoring storm water activity on a construction site, are outlined in - ANSWERSNPDES When should you read and understand SWPP - ANSWERSImmediately after project is awarded and before you begin any site work What is not an allowable storm water discharge or non-storm water discharge - ANSWERSContaminated ground water When may construction activity begin - ANSWERSWhen jurisdiction of operations specifies you can start Waters that fail anti-degradation list are placed on which list. - ANSWERS303D list SWPPPs certification are signed by who - ANSWERSAn officer and project owner The document that must be completed signed and submitted to the state to obtain authorization to discharge is the NOT. (T/F) - ANSWERSFALSE NOT can be filed when - ANSWERSAll construction has been completed both inside and outside Operations on a construction site are the entity in charge of plans and specification and the entity who? - ANSWERSis in charge of daily activities Motives for staying in compliance with storm water objectives? - ANSWERSStay out of trouble with the law Objectives of the clean water act are - ANSWERSTo protect and preserve beneficial use of U.S. waters, maintaining their clean, physical and biological integrity NPDES stands for - ANSWERSNational Pollutant Discharge Elimination System Which are a component of a good SWPPP - ANSWERSSite description and maps, inspection and maintenance procedure. Potential pollutant sources, schedules of activities, site contact information, plan certification documents, site contact info and descriptions of controls BMP
Document information
- Uploaded on
- April 27, 2024
- Number of pages
- 9
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers