SWPPP study guide 100% Correct!
Clean Water Act - ANSWERSLaw set into place in 1970 for storm water regulation NPDES - ANSWERSRegulations for monitoring storm water activity on a construction site, are outlined in Immediately after project is awarded and before you begin any site work - ANSWERSWhen should you read and understand SWPP Contaminated ground water - ANSWERSWhat is not an allowable storm water discharge or non-storm water discharge When jurisdiction of operations specifies you can start - ANSWERSWhen may construction activity begin 303D list - ANSWERSWaters that fail anti-degradation list are placed on which list. An officer and project owner - ANSWERSSWPPPs certification are signed by who FALSE - ANSWERSThe document that must be completed signed and submitted to the state to obtain authorization to discharge is the NOT. (T/F) All construction has been completed both inside and outside - ANSWERSNOT can be filed when is in charge of daily activities - ANSWERSOperations on a construction site are the entity in charge of plans and specification and the entity who? Stay out of trouble with the law - ANSWERSMotives for staying in compliance with storm water objectives? To protect and preserve beneficial use of U.S. waters, maintaining their clean, physical and biological integrity - ANSWERSObjectives of the clean water act are National Pollutant Discharge Elimination System - ANSWERSNPDES stands for
Document information
- Uploaded on
- April 27, 2024
- Number of pages
- 9
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers