MAN 4583 EXAM 2 2024 WITH 100% CORRECT ANSWERS
MAN 4583 EXAM 2 2024 WITH 100% CORRECT ANSWERS Which of the following represents an activity on an AON project network? - correct answer A node When translated into a project network, a work package will become - correct answer one or more activities Which of the following is provided by both the project network and the work breakdown structure? - correct answer activity duration On a project network, the activity times are derived from the - correct answer work package An activity that has more than one dependency arrow flowing into it is termed a - correct answer merge activity Which of the following can be used without coordinating with managers of succeeding activities? - correct answer free slack Activities which can take place at the same time are termed - correct answer parallel activity Bill is building a project network that involves testing a prototype. He must design the prototype (activity 1), build the prototype (activity 2), and test the prototype (activity 3). Activity one is the predecessor for activity 2 and activity 2 is the predecessor for activity 3. If the prototype fails testing, Bill must redesign the prototype; therefore, activity 3 is a predecessor for activity 1. This is an example of - correct answer Looping ________ activities must be completed immediately before a particular activity. - correct answer Predecessor The forward pass in project network calculations determines all of the following EXCEPT - correct answer How soon the project will be finished
Document information
- Uploaded on
- April 26, 2024
- Number of pages
- 6
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers