ACI Test EXAM(Graded A+ actual test)
The total time allowed between obtaining the first and final portions of a composite sample is - Answer- 15 minutes When it is necessary to wet sieve the concrete sample, wet sieving should be performed after the individual samples are remixed into a composite sample (T or F) - Answer-F Tests for slump, temperature, and air content must begin within ______ minutes after obtaining the composite sample - Answer-5 minutes Begin molding test specimens within ______ minutes after obtaining the composite sample - Answer-15 minutes The concrete samples should be protected from - Answer-the sun, wind, and other sources of rapid evaporation, from contamination When test specimens are to be molded, the minimum size of sample obtained is - Answer-28 L (1 ft^3) The primary objective of the sampling process is to obtain a representative sample (T or F) - Answer-T When sampling from a revolving drum truck mixer collect concrete from ______ portions of the batch - Answer-2 or more Wet sieving is performed - Answer-when the concrete contains aggregates larger than appropriate for a test When sampling from a paving mixer it is not acceptable to place 3 small containers on the sub grade in order to obtain the required samples of concrete (T or F) - Answer-F TEMPERATURE - Answerit may require up to ___ min before the temp stabilizes when the NMS of the coarse agg is greater than ___ - Answer-20min., 3in. The container for the concrete shall be large enough to provide at least ___ inches, or _____ of coarse agg, of concrete in all directions around the TMD - Answer-3in., 3 x NMS The temperature measuring device shall have the capability of measuring the temperature of the freshly mixed concrete to ± ______ oF accuracy and have a range of ______ to ______ oF. - Answer-1,30to120 A composite sample of concrete is not required even if the only purpose for obtaining the sample is to determine temperature. T or F - Answer-T The Temperature Measuring Device used for determining concrete temperature must be calibrated ______ or whenever there is a question of accuracy. - Answer-annually The temperature of freshly mixed concrete can be measured in - Answer-all of the above Submerge the sensing portion of the thermometer at least ______ inches into the concrete - Answer-3 Gently press concrete around the thermometer such that the_______ does not affect the reading. - Answer-ambient air temp The thermometer must remain in the concrete during the measurement for a minimum of ______ minutes. In addition, the temperature measurement must be completed within _______ minutes after obtaining the sample. - Answer-2, 5 The temperature of freshly mixed concrete is measured and recorded to the nearest _____ - Answer-1 degree SLUMP TEST - Answer****The slump test does not provide an indication of the water content of a concrete mixture. - AnswerF A slump mold can be fabricated from both plastic and metal. - Answer-T ****The length of the tamping for the slump test shall be approximately - AnswerThe slump test is applicable to concrete having a coarse aggregate up to _______ inch in size. - Answer- 1.5 inches The height of the slump cone is - Answer-12 in
Written for
- Institution
- ACI
- Course
- ACI
Document information
- Uploaded on
- April 24, 2024
- Number of pages
- 8
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal