BNSF Train Dispatcher Test 2 (Two) with complete solutions | Latest 2024/2025
BNSF Train Dispatcher Test 2 (Two) with complete solutions | Latest 2024/2025 What is the verbiage would you say if you need to ask a train to change an established route? what verbiage would you use? AKA: if you need to take a signal back on a closely approaching train, what would you ask? ️ Can the engineer comply with a signal change to stop. Engineer must identify themselves by name and that same exact thing that I asked them. If I looked at a Mile Post and it has an X or Z at the end of it...what does that mean? i.e., 9.2x ️ duplicate Mile Post What are the two ways to get authority in CTC? What are the three authorities in TWC? ️ CTC - signal indication & verbal authority from the train dispatcher TWC- Track warrant, Restricted Limits & Yard limits What are the three verbal authorities in CTC? ️ 10.1 - authority to enter the main track 10.3 - Track and Time 9.12.1- authority to pass stop signal indication If a train dispatcher is looking at a Timetable and looking at a station it shows a J,B & T. What do these abbreviations mean? ️ J - Junction B - General Orders, Notices, and Circulars T - Turning Facility What is the definition of Main Track? ️ A track extending through yards and between stations, that must not be occupied without authority or protection. Main Track ️ A track extending through yards and between stations that must not be occupied without authority or protection. What is a movement oppos
Written for
- Institution
- BNSF Train Dispatcher
- Course
- BNSF Train Dispatcher
Document information
- Uploaded on
- April 17, 2024
- Number of pages
- 14
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- bnsf train dispatcher
- bnsf
-
bnsf train dispatcher test 2 two with complete s
-
bnsf train dispatcher test 2
Also available in package deal