ACI Concrete Field Testing Technician- Grade I Questions and Answers Already Passed
ACI Concrete Field Testing Technician- Grade I Questions and Answers Already Passed The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete. 3 in. [75 mm] The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. 1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C] The temperature measuring device shall be calibrated _____, or whenever there is a question of _____. Annually, accuracy The temperature of concrete may be measured in a wheelbarrow. True or False? True The temperature of concrete may be measured in a wall form. True of False True A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. True of False? False What must be done to the sample container prior to sampling the concrete? Dampen (with water) What must be done to the concrete surrounding the temperature measuring device after the device is submerged in the fresh concrete. Gently press the concrete around the temperature measuring device at the surface of the concrete How long must the temperature measuring device remain in the freshly mixed concrete? At least 2 minutes but not more than 5 minutes After the temperature of the concrete is read, what is required? Reporting of temperature The temperature of concrete is reported to the nearest _____ degrees F [_____ C] 1 degree F [0.5 C] According to ASTM C1064, what is one reason to take the temperature of concrete? Verify conformance to a specified requirement for temperature of concrete A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of False? False The sample of concrete used for temperature determination must be rodded 25 times. True or False? False Sampling by this method is required when tests are to be made to determine _____ with specification requirements. Compliance This method covers sampling from four types of mixtures which are _____, _____, _____, and _____. Stationary mixers, paving mixers, revolving drum mixers, and open top mixers The maximum allowable time between obtaining the first and final portions of a composite sample is _____ minutes. 15 Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the sample. True of False? True The maximum elapsed time allowed between obtaining the final portion of the composite sample and beginning the tests for slump, temperature, and air content is _____ minutes. 5 The molding of strength test specimens shall begin within _____ minutes after fabricating the composite sample. 15 The concrete sample must be protected from contamination and _____. Rapid evaporation The minimum size sample for making strength
Written for
- Institution
- ACI Concrete Field Testing Technician
- Course
- ACI Concrete Field Testing Technician
Document information
- Uploaded on
- April 11, 2024
- Number of pages
- 23
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
aci concrete field testing technician grade i que
Also available in package deal