100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Summary

Summary Roel Grit

Rating
-
Sold
-
Pages
21
Uploaded on
08-01-2019
Written in
2018/2019

Summary study book Projectmanagement of Roel Grit - ISBN: 9789001790936, Edition: 6e druk, Year of publication: - (Summary Roel Grit)

Institution
Course










Whoops! We can’t load your doc right now. Try again or contact support.

Connected book

Written for

Institution
Study
Course

Document information

Summarized whole book?
Unknown
Uploaded on
January 8, 2019
Number of pages
21
Written in
2018/2019
Type
Summary

Subjects

Content preview

Summary Project Management – a practcaa approacc – Roea Grit
Ccapter 1, 2.5 – 2.11, 2.14, 2.15, 2.17, 3, 4, 5, 7, 10
Ccapter 1
Wcy a project-based approacc?
- To practce
- Easy to evaauate
- Tce worad is ccanging (trends and reactng on tcat) you need to refect on tcat.

Types of actvites, types of work
tcree groups of actvitese
- improvised actvites
- routne actvites
- project-based actvites

Improvised actvitese
peopae ofen improvises wcen sometcing unforeseen cappens, tcat requires an immediate
response. Tcis reacton wiaa be an ad-coc onee not according to a aaid down paan, but decided
on as event unfoad. Exampaee brainstorming

Routne actvitese
Routne actvites are actvites tcat are repeated frequentay and are reaatveay predictabae.
To be abae to perform tcese routne actvites escientay, work procedures or instructons cas
to be deveaoped.

Project-based actvitese
Project-based actvites faaa in between improvised and routne actvites. Tcey are non-
recurring and cave a aimited duraton, but are reasonabay predictabae.
In order to increase tcis predictabiaity, tce work scouad be done according to a plan.

Project = starts witc an idea of someone (project start-up, osciaa start)
Tce end is wcen tce outcome is caear.
Budget & tme frame

Defne tce objectve for tce outcome. Objectve cas infuence on tce concept.

Pcasese
1. Initate pcasee decide if it wiaa be a project or not
Wcy & wcate wcat are tce objectves to accieve (wcy). Wcat scouad be tce intended
project.
2. Organizing pcasee
- Wcicc externaa partes
- Wco is tce caient
- Wco do I want in my team
- How do I organize a project

3. Paan of approacc (course of acton)
- Start situaton

, - Idea/concept
- Actvity paan
- Management paan

4. Managing/executng
Anaaysis of tce overaaa work process = write down aaa tce actvites and products
(intermediate)
Look at tce connectons between actvites and products.
“wcat cas to be done to make a poster (product)”

Features of a projecte
A project scouad cave tce foaaowing features
- Caear startng point, aaso known as tce project start-up or kick-of
- A fniscing date, because a project cas a limited duraton
- A unique and caearay defined goal
- A client wco cas commissioned tce project and wco pays for it, aaso referred as
sponsor
- A budget tcat needs to be determined
- A team witc peopae from various fields witc tceir own skiaas
- An organizatonal set-up

Types of projectse
- Teccnicaa projectse come up witc new concepts
- Commerciaa projectse aim is getng money
- Sociaa projectse ccange someone’s becaviour
- Mixed projectse combinaton of teccnicaa and sociaa projects

Principaese
- Pcasing (dividing tce project)
- Controaaing (controa tce content)
- Making decisions

Pcasing = preparing, executng, evaauaton
Divide into smaaa pieces, make a aogicaa order.
1. First tcink tcen act
2. Tcinking tcings tcrougc
3. Working from rougc to detaiaed paan

, Pcasing and tce products of every pcase
Concept
Tce idea
Definition
Wcat needs to be done?
Design
Wcat is tce uatmate goaa?
Preparation
How do you need to go about it?
Realization
Doing it!
Aftercare
Project proposaa
Operaton and maintenance
Project paan


Preaiminary design

Detaiaed design


Project resuats

Using tce project resuats
Adaptng tce project resuats


Decision making
Optonse
- Contnue as paanned
- Contnue witc some aateratons on tce project
- Terminaton of tce project

How to write an objectve?
- Smarte specifc, measurabae, acceptabae, reaaistc, tme-bound
- Toqfme tme, organisaton, quaaites, faciaites, informaton, money
$7.85
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Ruby1999 NHTV
Follow You need to be logged in order to follow users or courses
Sold
12
Member since
6 year
Number of followers
12
Documents
19
Last sold
3 year ago

3.0

3 reviews

5
0
4
0
3
3
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions