MGSC 395 EXAM 2 STUDY GUIDE
MGSC 395 EXAM 2 STUDY GUIDE CHAP 5 Calculate the capacity for a process Capacity Maximum rate of output of a process or system Calculate the throughput time for a process route (Page 183) Throughput The total elapse time from the start to the finish of the job Know and understand the bottleneck Bottleneck A capacity constraint resource (CCR) whose available capacity limits the organization’s ability to meet the product volume, product mix, or demand fluctuation required by the marketplace Constraint- any factor that limits the performance of a system and restricts its output A workstation in process is a bottleneck if: 1. It has the highest total time per unit processed, 2. It has the highest average utilization and total workload, or 3. A reduction of even a single minute in its processing time would reduce the average throughput time for the entire process Calculate the average capacity per hour for the process if a percent went one route and another percent went another route Using traditional method, in wh
Written for
- Institution
-
University Of South Carolina
- Course
-
MGSC 395
Document information
- Uploaded on
- April 7, 2024
- Number of pages
- 7
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- mgsc 395
-
mgsc 395 exam 2 study guide