Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

Hoistway structures 215 pit structures Questions with Answers

Document preview thumbnail
Preview 2 out of 5 pages

The elevator pit is located between the sill level and the lowest landing and the - Floor of the elevator hoistway Four items of personal safety equipment you should have when working in the elevator hoistway are - Hard hat, glasses, harness, safety shoes All measurements necessary for the installation of various components in the pit are measured with reference to the - Guide rails When working in the pit that has been waterproofed - You must notify the general contractor before drilling or cutting into the wall or pit floor All passenger and freight elevators must be equipped with buffers under the - Car and counterweight The loss of traction created between the hoist ropes and the machine driver when the counterweight lands on its buffer avoids - The elevator car from being pulled into the overhead Spring buffers are used on an elevator traveling at - 200 FPM or less The distance the contact end of the spring buffer should be compressed so that all coils of the spring came in contact with each other is known as the - Buffer stroke A spring buffer must hold ___ the static load of the loaded car or the counterweight without being compressed solid - Twice When one spring buffer is used, it should be installed so that the vertical centerline is within ___ inches of the vertical centerline of the car or counterweight striking plate. - Two Before permanently mounting the assembled buffer channel to the guide rail or counterweight rail, check - That the channel is at the proper floor level, that the channel is level, and that the DBG distance is proper. The finished pit floor is normally poured to the - Lower web of the pit level Oil buffers are required on elevators having car speeds of - More than 200 FPM When an oil buffer is part of the counterweight instead of being installed in the pit under the counterweight, it is called a - Gravity return


Document information

Uploaded on
April 2, 2024
Number of pages
5
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TeeGrades
3.5
(53)
Sold
205
Followers
125
Items
5364
Last sold
1 month ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.