CEA Level 1
CEA Level 1 When drilling into brick or concrete block, you will need _______ plus your protective equipment - Hammer drill and masonry bit T/F When selecting personal protective equipment for protection against air borne particles, a dust mask is not considered a respirator ` - False A ____ bit is required with a hole in the end for the purpose of attaching a wire - Bell Hanger A __ is used for pulling wires and cables through a conduit - Fish Tape Which of the following is not considered a specialty CCTV tool? a.) tone generator with probe b.) compression tool c.) test monitor d.) coax stripper - A A hybrid system does which of the following? - -Combines hardwired and wireless technologies - uses resistors for supervision - combines technologies allowing you to keep cost down ALL Which one is not a component of a CPU? a.) potentiometer b.) PGM terminal c.) heat sink d.) PIR - D T/F primary power should never be unswitched - False T/F The function of the communicator is to transmit a signal to a predetermined location - True What would you expect in/from an alarm control panel? - - responds to user inputs -responds to signals form initialing devices -activates notifications devices -performs off-site notifications ALL Y/N 24AWG --- 3.5 MAX CURRENT ----- 88OHMS PER 1000 FT - yes its current carrying capacities T/F Every control panel does not require a means for the customer to submit request for arming, disarming, bypassing zones or obtain system status and history. - False A small subdivision into which large areas are divided to permit selective access to some while maintaining other zone secure defines what? - Zone A good device or location to program as a zone type 2 is? - Overhead door or door needing extended entry delay A smoke detector should be programmed as what zone type? - type 09 T/F If a device programmed as type 22 is tripped, it will activate the bell/siren circuit. - False T/F when using a normally closed contract, a protective loop will open during an alarm event - False T/F A normally open contract will allow potential to move through the contract when under the influence of a magnetic field - True Windows located more than 18 feet above the ground or other roofs are considered _____ - inaccessable T/F An intruder entering a premise through a broken window would be detected if a magnetic contact were installed on the window. - False When installing magnetic contact on a movable window, the _____ must be placed on the movable portion of the window - Magnet __________ should be installed in front of and within range of the windows they are designed to protect - Glass break sensors T/F Smoke alarms are more commonly used by the home builders due to their increased sensitivity - False A smoke ____ is connected to a circuit which is connected to an alarm pannel. - Detector T/F If a siren is "integral" to the burglar alarm panel, it is not built-in to the panel - False The T3 audible notification pattern is used to indicate what type of notification. - Fire emergency According to NFPA 72 when using a decibel meter to test proper audible notification levels in a sleeping room, the door to the sleeping room must be? - Closed According to the standard UL 68(1), removable covers of plates of conduit boxes or junction boxes shall be electrically tampered or permanently secured with
Document information
- Uploaded on
- March 24, 2024
- Number of pages
- 13
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers