HUD GUIDELINES EXAM 2024
HUD GUIDELINES EXAM 2024 lead poisoning causes: ANS-coma, convulsions, death lead ANS-heavy metal that is denser than most common materials. Lead is soft and malleable, and also has a relatively low melting point. Most at risk population for lead poisoning ANS- 6 years old Neuro-toxic effects from lead: ANS-low IQ, attention deficit, learning/reading disabilities, hyperactivity, behavioral problems Leading cause of lead poisoning ANS-ingestion of leaded dust chelation therapy ANS-excretion of lead (heavy metals) from the body Title X Framework ANS-only federal grant program dedicated solely to providing individuals with comprehensive family planning and related preventive health services lead-based paint hazard ANS-any condition that causes exposure to lead from lead contamination dust; bare, lead-contaminated soil; or lead-based paint that is intact or deteriorated present on accessible surfaces, friction surfaces or impact surfaces paint inspection ANS-a surface-by-surface investigation of all painted surfaces using an XRF analyzer of lab analysis, can be performed by either a certified inspector technician or RA paint inspection purpose ANS-to identify the presence of lead-based paint risk assessment ANS-an on-site investigation of a residential dwelling for lead-based paint hazards and includes (but not limited to) a visual inspection; limited environmental samples; report of results with acceptable abatement and interim control strategies 3 types of lead hazard control ANS-1) interim control, 2) abatement of lead-based paint hazards, 3) complete abatement of lead-based paint interim control ANS-set of measures designed to temporarily reduce human exposure or likely exposure to lead-based paint hazards abatement of lead-based paint hazards ANS-any set of measures designed to permanently eliminate lead-based paint hazards not necessarily all lead-based paint complete abatement of lead-based paint ANS-the permanent control of all lead-based paint using the same methods as those included in the definition of abatement of lead-based paint hazards risk assessor ANS-certified professional who can ID lead-based paint hazards and provide recommendations to owners on acceptable option for controlling them inspector technician ANS-trained to ID lead-based paint on a surface-by-surface basis T/F no requirements of certification/training is required for interim control work ANS-True, but OSHA requires that workers dealing with lead-containing surfaces be trained preliminary determination of lead hazards control strategy ANS-condition of the property, age of the property, capital replacement plans types of insurance ANS-general liability (all parties), pollution liability (all parties, error and omission liability (consultants) Define project completion ANS-no interim control or abatement project is complete until compliance with clearance standards have been achieved and a final report prepared - the work area cannot be released to residents until a visual evaluation and dust sampling have been complete 5 basic precautions for older home renovation ANS-1)resident protection, 2) OSHA regulations, 3) waste mana
Document information
- Uploaded on
- March 15, 2024
- Number of pages
- 8
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers