Mk1 swe question and correct answer 100%
what are two types of maintenance - Correct Answer Corrective and preventative What article always captain to conduct NJP - Correct Answer Article 15 Where two types of procedures that may be accessed from maintenance procedure option - Correct Answer Official and local Who is authorized to conduct tag outs - Correct Answer Authorizing officer Out of calibration tags should be used when - Correct Answer When indicating parameter errors are small and consistent For modernized units the boat inspection reports are to be entered through - Correct Answer Almis/ EALpage Cutter engineering report shall be completed in accordance with - Correct Answer Naval engineering manual chapter 90 On an MPC the warning shall come where in the text - Correct Answer Before the instruction On an MPC what would constitute an expendable - Correct Answer Rags PMS that does not need to be included in the cutter engineering report is - Correct Answer Daily and weekly With regards to casreps what is mandatory on all updates corrects and cancellations - Correct Answer REF Which unit besides a shore unit are exempt from filling out the POSIT line - Correct Answer Cutter underway A casrep it should be made as soon as possible no later than ____hours - Correct Answer 24 Casualties that effect a secondary mission should always have a casualty category of - Correct Answer 2 AMPN is mandatory after any set that contains an entry of? - Correct Answer Other, tech, none In a 1PARTSID if the NIIN is not known what needs to be put in the line - Correct Answer Unknown What is the criteria for submitting CASCOR - Correct Answer The delay expressed an hours, and correcting the casualty due to parts unavailability, a list of all parts requested and dates received; the total number of man-hours expanded; the number of equipment hours since last failure You find something else wrong with the piece of equipment that has already been CASREP'd you should send an? - Correct Answer Update Where do you find the hierarchy of guidance for specification plans - Correct Answer NEM chapter 41 Which specifications may be used as a guided researching propose engineering changes and solutions - Correct Answer GSO Which specification do not apply to construction, alteration or maintenance of Coast Guard cutters - Correct Answer Commercial general specifications for t-ships Where do you find the authorized material list for deck coverings - Correct Answer Naval engineering manual chapter 634 110 - WPB - 521-01, what does 5 21 represent - Correct Answer SW BS number Enthusiasm for realistic drills must outweigh sound judgment, or sound evaluation of the______ - Correct Answer State of the crew Casualty control is used for what type of casualties - Correct Answer Operational and battle How do you connect the battery in parallel - Correct Answer Positive to positive negative to negative How do you hook up an ammeter - Correct Answer In series What do you clean a battery terminal with - Correct Answer Sodium bicarbonateammonia If a CAN and buss has 120 ohms resistors at each and what is the total resistance on a good CAM buss - Correct Answer 60 ohms As wire sizes increase what happens to resistance and amperage - Correct Answer Resistance goes down and Amperage increase Is a DIN what is represented by the letter K - Correct Answer Relay Is a DIN what is represented by the letter F - Correct Answer Fuse/breaker When charging a battery for the first time the chart should be - Correct Answer Longlow rate The MPU - 23 card exhibits what color lights on the panel when operating normally - Correct Answer Green yellow yellow How would you test a 4-20mA sensor - Correct Answer In mA, in series When testing p1000 pyrometer meter and you read 0 ohms - Correct Answer The center is good/closed Installed in all PIM1 and PIM2 cards - Correct Answer MPU23 What does CAN mean in a CAN b
Document information
- Uploaded on
- March 13, 2024
- Number of pages
- 13
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers