• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 4 pages
Exam (elaborations)

API 653 Recertification Quiz Already Graded A+

Document preview thumbnail
Preview 1 out of 4 pages

API 653 Recertification Quiz Already Graded A+ Per API 653 , with of the following is required when converting an existing tank to operation at elevated temperatures when it was not originally designed and constructed to API 650, Appendix M? The Shell to bottom joint shall be evaluated for fatigue When removing an existing tank bottom, all arc-gouged areas of the tank shell-to-bottom shall be: examined using magnetic particle inspection, and defective areas repaired and re-examined. If RBI assessment has been conducted and the tank has cathodic protection plus a thin-film lining, the maximum inspection interval is: 14 years When installing a new nozzle in a tank of unknow material, what stress value should be used to calculate the required shell thickness and reinforcement? 20,000 lbf/in2 In regards to underside corrosion on tank bottoms, the corrosion rate of steel in a wet environment. may double with every 18 °F increase in temperature above 77 °F. Grade 350W/50W is acceptable for tank plate to a maximum thickness of: killed and made to a fine grain practice. 45mm (1.75in) if fully If an RBI assessment has been conducted and the tank has a release prevention barrier, the maximum initial inspection interval is: 25 years As an alternative to the procedures in API 653 for the evaluation of any thinning of the tank shell below minimum required wall thickness may be evaluated for continued service using which code? API RP 579, section 4, 5 or 6. When welding on a tank shell constructed of Group I steel that is greater than 1.5 inches thick below what minimum metal temperature ?preheat? 200°F When evaluated an existing temperature services tank, which has a successful service history of operation but was not originally designed and constructed to the requirement of API 650, appendix M, which condition temperature has to be used? The max Operating Temperature shall not exceed the temperature at which the tank has successfully operated in the pass. Flange material used for tank repair and alteration shall meet the minimum requirements for the material specifications according to: The as built standard which is an advantage of thick film UN-REINFORCED linings ? service after 24 hours at normal ambient temperature. Fast curing and can be put back in The perimeter welds on a welded-on patch plate in the critical zone should be ? examined visually and by either MP or PT. Two-pass and Existent welds on a tank shell are found to e closer than allowed by API 650 (7th Edition). Under what conditions can these welds be considered to be acceptable for continued service? Examined by MP inspection with no rejectable indications. The requirements of which standard shall be considered in the evaluation and alteration to the tank roof and roof-to-shell junction ? Current applicable standard Welding procedure for ladder and platform assemblies, but not their attachment to the tank? Shall comply with either AWS D1.1, AWS D1.6 or ASME Code Section IX. In floating roof tanks, shell nozzles without internal piping within operating range of the floating roof shall be supplied? Flush on the inside of the tank. The attachment welds of new lap-welded shell patch plates shall be examined by: either MP or PT Visually and by What is the minimum external projection outside the shell for bottom plates in a new tank? inches Subject to the purchaser's approval, where normalized plates are required? 2 Thermo mechanical control process (TMCP) plates may be used. During welding operations the inspector should confirm by the WPS and WPQ The welding parameters are supported If a release prevention system utilizing a nonconductive, impervious external liner is installed under a new tank, what should be done? Anodes shall be placed between the external liner and the tank bottom in a conductive material. The activity that is used to a currently determine the remaining bottom thickness in areas where indications are found it is called? Sizing (Proc up) Minimum dimension of a shell flash patch? Max size of shell Lap-patch? 48"x72" Minimum repair plate dimension? 4" 12" The likelihood of caustic stress corrosion cracking can be reduce by: Stress relieving Scribe the flexible joint across the two moving faces and raise end of swing line to check? freedom of movement Minimum size of bottom lap-patch that does not cross a bottom seam? Minimum amount of shell UT on shell plate? 6" At least 5 equally spaud areas for UT. On fixed roof, planks long enough to span at least 4.5 Two roof raffer Joints At what PH does a thin iron sulfide layer deposit on the steel and provides some protection to


Document information

Uploaded on
March 12, 2024
Number of pages
4
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
CertifiedGrades
3.9
(38)
Sold
149
Followers
61
Items
8729
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.