MA Journeyman Exam Questions and Answers 100% Solved
MA Journeyman Exam Questions and Answers 100% Solved How long must a licensee retain their continuing education certificates - answerthree renewal cycles For building owned or used by the Commonwealth of Massachusetts, a gas fitting permit shall be filed with - answerState Board of Examiners of plumbing and gas fitters Who has the authority to revoke a LP installer license - answerState Board of Examiners of Plumber and Gas Fitter When plans and specifications are required, the inspector may review the plans, prior to issuing a permit, for up to: - answer30 days During the renewal cycle, Gas fitters and Undiluted Petroleum Gas Installers must complete how many hours of continuing education - answer6 According to OSHA, when trench is 4' deep or more a ladder must be provided as a form of egress if the trench is longer than how many feet - answer25 What scenario would qualify a journeyman gas fitter for an exemption from continuing education? - answerturned 65 prior to current cycle How long does and apprentice need to retain their w-2 forms after passing the journeyman exam - answer7 years All plumbing variances submitted to the Board must include - answerthe location of the proposed variance Name the ways a plumbing inspector must accept a properly filled out plumbing/ gas permit - answersubmitted in person submitted by mail if the town has online permitting A plumbing permit would be not valid if the work is not started within how many days - answer90 days what must a journeyman or master include on all advertising of their business - answerLicense number and designation How many hours per license cycle of continuing education does a plumbing and gas inspector need - answer24 How many days does a licensee have to respond to a letter from the board - answer10 business days Who appoints the local plumbing and gas inspector for each city or town - answerLocal building inspector What type of plumbing business is not required to get a business license through the plumbing board - answersole proprietorship A licensed Massachusetts Master Plumber submitting an application to become a corporation must be: - answerAn officer of the corporation _____________________ is considered proper notification from a licensee to the inspector that work is ready for an inspection - answerDirect communication from the licensee to the inspector A permit must be terminated by - answerProviding written notice A permit is not required for - answerA repair on valve on a leaking faucet Clearing stoppage Adjusting gas appliance controls but not changing piping arrangement At what pressure does gas piping need to be welded at - answerover 5 PSI Elevated pressure gas piping must be labeled at - answerevery 10 feet when gas is above what pressure it is no longer considered to be low pressure - answer.5 PSI Installation of unlisted gas appliance equipment and accessories is only allowed - answerwith variance from plumbing board When installing a gas line underground inside a building, what is NOT required with the conduit installed around the gas line - answerit must be of same material as the gas pipe When testing a low pressure gas piping system in excess of one million BTU per hour, what is not required - answertest duration shall not be
Written for
- Institution
- Journeyman Plumbing
- Course
- Journeyman Plumbing
Document information
- Uploaded on
- March 7, 2024
- Number of pages
- 12
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
ma journeyman exam questions and answers 100 solv
Also available in package deal