Chapter 4. HAZWOPER (Hazardous Waste Operations and Emergency Response) Exam |52| Questions With Verified Answers
Chapter 4. HAZWOPER (Hazardous Waste Operations and Emergency Response) Exam |52| Questions With Verified Answers The speed with which emergency action can be taken is largely dependent on: a. Size of the emergency b. Number of flood victims c. Prior planning d. Volcanic eruptions ANS-c. Prior planning The evacuation and survival of individuals in an emergency or natural disaster are dependent on the extent to which: a. Individuals can help themselves b. How soon relief can mustered c. How soon a favorable or controlled environment can be restored d. All of the above ANS-d. All of the above The ____________ is usually involved in dealing with major disasters. a. American Legion b. Federal Emergency Management Agency c. Red Cross d. Both b and c ANS-d. Both b and c If temporary shelter is necessary in an emergency, shelter selection should take into consideration: a. Protection from flooding and the elements b. Availability of heat, light, and space c. Both a and b d. Color of chlorination tablets ANS-c. Both a and b Natural disaster victims should be provided with how much water per day? a. 1 to 3 gallons b. 3 to 6 gallons c. 6 to 9 gallons
Document information
- Uploaded on
- February 28, 2024
- Number of pages
- 14
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers