SAFE 5 AGILIST EXAM (5.1) 2023 VERIFIED QUESTIONS AND ANSWERS LATEST UPDATE GRADED A
SAFE 5 AGILIST EXAM (5.1) 2023 VERIFIED QUESTIONS AND ANSWERS LATEST UPDATE GRADED A SAFe 5 Agilist Exam (5.1) What is one benefit of unlocking the intrinsic motivation of knowledge workers? To provide autonomy with purpose,mission, andminimum constraints To strive to achieve a state of continuousflow To lower work in process(WIP) limits To centralize decision-making Which statement is a principle of the Agile Manifesto? Respect for people and culture Visualize and limit WIP,reduce batch sizes, and manage queue lengths Measure everything Simplicity–the art of maximizing the amount of work not done–is essential What are the three primary keysto implementing flow? (Choose three.) Manage queue lengths Visualize and limit work in process (WIP) Increase capacity Frequent context switching Addressthe systemic problems Reduce the batch sizes of work What is part of the role of Product Management? To facilitate backlog refinementsessions To prioritize Enablers To assign business value to Features To prioritize the Program Backlog Whatisthe biggest benefit of decentralized decision-making? Creating better visualization Delivering value in the shortestsustainable lead time Removing accountability from leaders Ensuring strategic decisions are not made in a vacuum Design Thinking identifies at least four new waysto measure success. What are two of those ways? (Choose two.) Desirability Scalability Reliability Marketability Sustainability Which statement istrue about DevOps? Lean-Agile principles are not necessary for a successful DevOpsimplementation Measurements are not a top priority for DevOps DevOpsis an approach to bridge the gap between development and operations DevOps automation of testing reduces the holding cost In the Program Kanban some steps have work in process(WIP) limits. Why isthis necessary? Tokeep timebox goals Tohelp Continuous Deployment To enable multitasking To ensure large queues are not being built The House of Lean is a classic metaphor describing the mindset essential for Lean thinking. Which one of the four pillars advocates a 'Go See' mindset? Respect for people and culture Flow Innovation Relentlessimprovement Which two statements are true about uncommitted objectives? (Choose two.) Uncommitted objectives are not included in the team's commitment Uncommitted objectives help improve predictability Uncommitted objectives do not get assigned a planned business value score Uncommitted objectives are extra things the team can do in case they have time The work to deliver the uncommitted objectivesis not planned into the iterations during PI Planning What isthe best measure of progressfor complex system development? Prioritized backlog System Demo Inspect and Adapt Iteration Review What is Business Agility? How Lean-thinking people and Agile Teams optimize their business processes, evolve strategy with clear and decisive new commitments, and quickly adapt the organization as needed to capitalize on new opportunities. The ability to compete and thrive in the digital age by quickly responding to market changes and emerging opportunities with innovative business Solutions. Applying Lean-Agile principles and practicesto the specification, development, deployment, operation, and evolution of the world’slargest and mostsophisticated systems. A customer-centric approach to defining, building, and releasing a continuous flow of valuable products and services to customers and users. What is a minimum viable product? A minimal product that can be built to achieve market dominance A prototype that can be used to explore user needs A minimal version of a new product used to test a hypothesis A minimal Story a team can deliver in an Iteration Whatis one issue when organizing around hierarchical functions? It reduces political tensions It movesthe decision to where the information is It is not how value flows It creates Agile businessteams Product Management has content authority over the Program Backlog. What do Product Owners have content authority over? Team Backlog Portfolio Backlog Portfolio Vision Value Streams What is one of the Agile Release Train sync meetings? Solution Demo Iteration Retrospective Iteration Review Scrum of scrums What isthe basic building block when organizing around value? Agile Release Trains Hierarchies Individuals Agile Teams What can be used as a template for putting SAFe into practice within an organization? SAFeCore Values SAFe Principles SAFe Implementation Roadmap SAFe House of Lean The Agile Release Train uses which type of teamsto get work done? Solution teams Cross-functionalteams Management teams Phased-review-processteams Who has content authority to make decisions at the User Story level during Program Increment (PI) Planning? Scrum Masters Agile Team Release Train Engineer Product Owner What is considered an anti-pattern when assigning business valuesto team PI Objectives? Business Owners assign high valuesto important Enabler work Business Owners assigning the business value Assigning business valuesto uncommitted objectives All PI Objectives are given a value of 10 What can be used to capture the currentstate of the portfolio? Portfolio Backlog Portfolio Vision Portfolio Canvas Portfolio Kanban What is one Guardrail on Lean Budgetspend? Continuous Business Owner engagement Participatory budgeting Spending caps for each Agile Release Train Learning Milestones as objective measurements Whatis an example of applying cadence-based synchronization in SAFe? Teams meet twice every Program Increment (PI) to plan and schedule capacity Teams align their Iterationsto the same schedule to support communication, coordination, and system integration Teams allow batch sizes across multiple intervals Teams decide their own Iteration length Which two quality practices apply to Agile teams? (Choose two.) Decentralized decision-making Establishing flow Providing architectural runway Using nonfunctional requirements Peer review and pairing What isthe impact of Customer Centricity? Tointerpret market rhythms To design custom-built Customer Solutions To understand the Customer's needs To build small, partialsystems justin time How does SAFe provide a second operating system that enables Business Agility? By focusing on customers, products, innovation, and growth By creating stability and hierarchy By building up large departments andmatrixed organizations to support rapid growth By achieving economies ofscale What can be used to script the change to SAFe? The Implementation Roadmap The Program Kanban The Lean-Agile Center of Excellence (LACE) charter The portfolio canvas Which statement is a value from the Agile Manifesto? Respect for people and culture Limit work in process Build incrementally with fast, integrated learning cycles Respond to change What is one component of the Continuous Delivery Pipeline? Continuous Exploration Continuous Improvement Continuous Planning Continuous Cadence Which statement correctly describes one aspect of the team's commitment at the end of PI Planning? A team commitsto all the Features they put on the program board A team does not commit to uncommitted objectives A team commitsto all the Stories they put on their PI plan A team commits only to the PI Objectives with the highest business value If a program repeatedly showsseparate Feature branchesrather than a true System Demo, which practice should be reviewed to address the issue? Testfirst Continuous Integration Roadmap creation Scrum of scrums What are the last three steps of the SAFe Implementation Roadmap? Launchmore Agile Release Trains and Value Streams, extend to the portfolio, accelerate Launch trains, coach Agile Release Train execution, train executives and managers Train Lean-Agile change agents, extend to the portfolio, accelerate Train Lean-Agile change agents, identify Value Streams and Agile Release Trains, extend to the portfolio Which statement accurately characterizes Strategic Themes? They are a high-levelsummary of each program’s Vision and are updated after every PI They are requirementsthatspan Agile Release Trains but must fit within a single Program Increment They are business objectivesthat connect the SAFe portfolio to the Enterprise businessstrategy They are large initiatives managed in the Portfolio Kanban that require weighted shortestjob first prioritization and a lightweight business case When basing decisions on economics, how are lead time, product cost, value, and development expense used? Torecover money already spent To take into accountsunk costs To limit work in process(WIP) through the system To identify different parameters of the economic framework Which of the core competencies of the Lean Enterprise helps align strategy and execution? Business Solutions and Lean Systems Engineering DevOps and Release on Demand Lean Portfolio Management Team and Technical Agility What isthe foundation of the SAFe House of Lean? Relentless improvement Flow Leadership Value Which statement istrue about the Innovation and Planning (IP) Iteration? The Scrum Master can decide if the IP Iteration is necessary It is used as a weekly sync point between the Scrum Masters It is used annually when the team needsto refocus on work processes Withoutthe IP Iteration, there is a risk thatthe 'tyranny of the urgent' outweighs all innovation activities Which is an aspect ofsystemsthinking? Cadence makesroutine everything that can be routine Mastery drives intrinsic motivation The length of the queue impacts the wait time Optimizing a component does not optimize the system What must management do for a successful Agile transformation? Send someone to represent management, and then delegate tasksto these individuals Commit to quality and be the change agent in the system Change Scrum Masters in the team every two weeks Strive to think of adoption as an area they can control On day two of PI Planning, management presents adjustments based on the previous day's management review and problem solving meeting. What is one possible type of adjustment they could make? Adjust business priorities Create new User Stories Change a team’s plan Adjust the length of the PI How isthe flow of Portfolio Epics managed? In the Portfolio Kanban In the Program Backlog In the Program Kanban In the Portfolio Backlog Which statement fits with the SAFe Core Value of Built-inQuality? You cannotscale crappy code Quality should only be worked on during the Innovation and Planning Iteration Quality depends on the scale of the project and should be implemented from the top down Quality is not part of the SAFe Core Values What isthe laststep in Kotter's approach to change management? Sustain and improve Anchor new approaches in the culture Consolidate gains and produce more wins Generate short-term wins What isfound on a program board? User Stories Tasks Features Epics Agile Product Delivery Competency hasthe following dimensions(choose 3) Agile Product Delivery Competency hasthree dimensions: Develop on Cadence, Release on Demand, DevOps and Continuous Delivery Pipeline, and Customer Centricity What isthe recommended size of an Agile team An Agile Team is of team size 5-11 What are the 3 Cs of good story writing? Card, Conversation Confirmation - is a recommended approach for defining stories. Allow the story to be written on a small card/tool with notes for explaining the details, the details of the story are refined with the POand the acceptance criteria confirmsthat the story can be marked complete For PI planning the Agile Teams owns which of these two? (select 2) Agile teams own the Story planning and high level estimates. The teams committo PI objectives based on the planning they do based on the estimates they agree on One Portfolio can contain multiple Value Streams One portfolio can contain multiple value streams, you can also find a representation of thisin the Portfolio Canvas which mentions all Value Streams in the portfolio Three components of Cost of Delay are User Business Value, and (select 2) Components of CoD are: Business Value, Time Criticality and Risk Reduction and opportunity enablement A portfolio evaluatesits progress on Business Agility through A portfolio evaluatesits progress on Business Agility through Measure and Grow and carves out action plan for ongoing improvements SAFe Core Value of recommends communicating mission, vision and strategy at every opportunity Alignment core value encourages communicating the mission, vision to everyone in the team to align entire team When are the management review decisions communicated to the teams? Management review of the risks and impediments occur on day 1 end and the decisions are communicated back to the team on Day 2 start The recommended performance range for PI Objective performance of a team is between Recommended performance range is 80-100 Based on management review and problem solving meeting, some of the change areas could include the following (select 2) Management review of the risks and impediments occur on day 1 end and the changes could be in business priorities, vision adjustments, change in scope orrealignment of the teams Story maps are used to prioritize storiesthat are essential vs expected to delight the user TRUE Story mapssegregate stories between essential and possible improvementsin subsequentreleases In Lean Portfolio Management (LPM), the function of Strategy and Investment funding is(choose3) The function of Strategy and Investment funding is toDevelop Portfolio Strategy, Fund Value streams and Connect portfolio to Enterprise Strategy Small batch sizes move through the system and with variability Small batch sizes can be developed,tested, deployed faster hence they move through system faster, and also create lower variability Projecttracking using key eventslikeRequirement complete, Design complete, Development complete are examples of These are examples of Phase Gate milestones where it was assumed that all requirement, design can be known atstart and they will not change Design thinking leadsto a solution that isfeasible, economically viable,sustainable and Design thinking leadsto solutionsthat are VFD-S: Viable, Feasible, Desirable, and Sustainable Which part of SAFe House of Lean recommends to Build Quality in? Unless we build quality in, we will not be able to make Flow effective Which pillar of SAFe House of Lean talks about Go See or Gemba? Innovation talks about Go See/ Gemba - which represents going to the place where production happens or work is getting produced. Intent isto be familiar with the entire development process, and then think of improvements During any technological revolution, what isthe correctsequence of the three stages of transformation? Any tech revolution seesthree key stages of Installation period where new technology and entrants disrupts the market, Turning Point - where incumbents either change their business model and master technology or cease to exist, and Deployment Period - where new tech giants emerge and become dominant players Without the IP iteration, there is a high risk of growing uncontrollably Technical debt can grow if there is no IP iteration to focus on improvements A decision that can have a significant economies ofscale impact, can be a good candidate for decentralized decision making’ False. Thisis an example of centralized decision making asthis will have huge impact across organization Architecture Runway is built by enablers and consumed by features TRUE Thisis correct, Arch Runway is built by tech enablers and they are consumed by features Built-in Quality practicesthat can be adopted by hardware teams can be (select 2) MBSE and Set-based design practices can be adopted by teams working on hardware development In a Generative culture, In a Generative culture which is performance oriented, failure leadsto improvements as learnings are discussed and action plan to incorporate those are created and executed Incremental delivery approach has benefit of that increasesthe value over period of time, compared to a Waterfall model where the solution comestogether towardsthe end Fast feedback loop when done with an incremental approach invalidates many incorrect assumptions early on in the cycle, thus reducing the development effort, improving quality and reducing time to market In SAFe CALMR Approach for DevOps, a key enabler islarge batch sizesto enable Lean flow Small batch sizes are enablersfor DevOps In the context of Agile Principles, Who must work together with developers daily throughout the project to deliver value Businessstakeholders must work very closely with developersthroughout the projectsto deliver value. In SAFe Implementation Roadmap, what happens after training Executives, Managers and Leaders? Identification of Value Streams and ARTs happen once Executive, Managers and Leaders are trained There is a very high focus on Customer Centricity in model Network model - most organizations start as a flexible, adaptive network of passionate individuals focused solely on the needs of their customers Cone of uncertainty is a journey of knowing little initially towards converging on the actual solution using (choose 2) Flexible specifications and design sets are the two dimensions that converge on cone of uncertainty Five key roles on an Agile Release Train (ART) are RTE, Product Manager, System Arch, and (select 2) Business Owners and System team are ART roles Agile teamsresponsibility in PI planning are the following (select 3) Agile teams are responsible for Defining userstories and planning them into the iteration. They are also responsible to workout interdependencies with other teams ContinuousIntegration includes deploying the integrated solution on a Staging environment True - CI takesthe integrated code until the staging environment In Portfolio Kanban, an Epic is marked as Done when LPM governance is no longer required Once an Epic continues as business-as-usual in implementation stage and LPM governance is not required, its marked as Done in the Portfolio Kanban In Portfolio investmentstrategy, the type of applications appearing in Horizon 3 are Horizon 3 ideas are under - getting evaluated state Enabler stories can include functional scenario implementation, infrastructure, architecture work Enabler stories are tech oriented and will have infra, architecture work and not functional scenarios Teams can execute an iteration using Scrum or Kanban Agile teams can adopt Scrum or Kanban depending on nature of their work and whatever works best for their context There are core competencies of Business Agility There are seven core competencies of Business Agility in the SAFe Framework As part of Inspect & Adapt Problem Solving Workshop, at which step does the team apply 5 Whys? Teamapplies 5-Whys when they apply root-cause analysis using fishbone technique Reducing transaction costsreducestotal cost and lowers batch size Transaction cost reduction reduces total cost and also lowers the batch size, ex: automation and infra improvements reduce testing and deployment cost forsmall batch SWOT and TOWS are used to analyse the currentstate of Portfolio FALSE - SWOT and TOWS are used to analyse the currentstate and also to devise actionsto get to future state Which part of SAFe House of Lean covers Customer Delight? Value - the roof in the SAFe House of Lean is all about adding value to the customer, to go beyond meeting requirements and think of delighting the customer In economic trade-off framework, choosing a higher Value might lead to an increased and a reduced Increased development expense as we need to deliver faster which will need more team and reduced lead time as we release sooner Synchronization converts unpredictable events into predictable occurrences and lowers cost FALSE - Cadence and not Synchronization converts unpredictable events into predictable ones SAFe(R) Core Competency at the foundation of SAFe(R) Full Configuration is Lean-Agile Leadership Competency features as the foundation in the core competency model of SAFe(R) framework Product owners have content authority to make decisions at a userstory level (True or False) Product Owners are content authority at a story level System Demo is a Program level eventy System demo happens for all teams in a program with integrated code being showcased on an environment thatresembles Production, so it is a Program Event Story pointsrepresent estimatesin context of Volume, Complexity, and (select 2) Story pointsrepresent estimatesin context of Volume, Complexity, Knowledge and Uncertainty In John Kotter view of how to lead change effectively, empowering employees happens before creating a powerful guiding coalition Per Kotter, a powerful guiding coalition hasto be created and then employees need to be empowered amongst other steps to leading change SAFe supports a dual operating system that balances and Kottersuggests we need a dual operating system thatleveragesthe power of both Hierarchy and Network model Which pillar of SAFe House of Lean mentionsthat you need to optimize the whole to get desired benefits? RelentlessImprovement talks about optimizing the whole to get the desired benefits and not just localized improvements What all doesthe Solution Architect not describe in their address to the ART at the start of the PI Planning (select 3) Product Vision Overall Budgets Product Feature Listing Solution Architect istasked to ensure all the teams on the ART follow common frameworks and tooling to ensure minimal disruptions occur when the teamsintegrate As utilization increases, Cycle time increases for high batch sizes Increased utilization leadsto higher cycle time for completion of work when batch sizes are large Celebrate high quality and predictably delivered Program Increments are demonstrated as part of SAFe Core Value of Program Execution core value encourages people to celebrate high quality and delivery successes A decision with High cost of delay should be Itshould be de-centralized to let local teamsmake the decision asthey are closer to situation Organizational Agility Competency hasthe following dimensions(choose 3) Organizational Agility Competency has 3 dimensions: Lean -thinking People and Agile Teams, Lean Business Operations and Strategy Agility In SAFe CALMR Approach for DevOps, the letter R standsfor R represents Recovery approach and strategiesin CALMR approach Competenciesin Essential SAFe Configuration are (choose 3) Essential SAFe configuration has Agile Product Delivery, Team and Technical Agility and Lean-agile Leadership as the three competencies Complete the statement from the Agile Manifesto - "Individuals and interactions over " Individuals and Interactions over Processes and tools- thisreflectsthe basic premise of how the team should pivot while working to deliver value incrementally In SAFe DevOps approach, for Continuous Delivery Pipeline a key enabler isthe decoupling of and (choose 2) Deployment and Release are decoupled. While deploymentis ongoing as part of Continuous Deployment, Release is on-demand as prioritized by business stakeholders With reference to program risks, what does ROAM stand for? Resolved - Has been addressed. No longer a concern. Owned - Someone has taken responsibility. Accepted - Nothing more can be done. If risk occurs,release may be compromised. Mitigated - Team has plan to adjust as necessary. If a team haslow confidence in meeting a Pl Objective or hastoo many unknowns, whatshould they do during the PI Planning? The uncommitted objectives are a way forthe teamsto ensure they remain predictable with their commitmentsto business owners. Forsome reason if a specific team objective has open risks or other ambiguities and the team is not confident that they at this point in time are unwilling to commit to it, they can mark it under the uncommitted objectives. These are notsomething that will be done just in case there is time, Uncommitted objectives do count in velocity/capacity. Taking ownership and responsibility for errorsis part of which SAFe core value Transparency core value encourages keeping ittransparentin terms of ownershipsso that everyone is clear Some of the key sectionsin Epic Hypothesisstatement template are Business outcomes, Leading indicators Epic hypothesisstatement covers Business outcomes and Leading indicators, amongst other sections In Lean Portfolio Management (LPM), the function of Strategy and Investment funding isto establish a Portfolio Kanban system to establish flow Thisis correct,to bring visibility to Portfolio state, a Portfolio Kanban is established In Portfolio investmentstrategy, Horizon 1 applications are mainly of two types(choose 2) Horizon 1 applications are of type Investing and Extracting In SAFe Implementation Roadmap, what happens afteridentifying Value Streams and ARTs? Creating the implementation plan happens after identifying Value Streams and ARTs An Agile Release Train (ART) is a virtual organization of people An ART is a virtual org of 50-125 people By using Feature Toggles, new functionality can be hidden on Production and can be made available to users after ensuring it has passed the require tests The decision to release on Production is of businessstakeholders and they can choose to switch on the toggle once they are confident of release In Portfolio Kanban, all new ideas are captured in stage All new ideasin Portfolio Kanban get captured at Funnel stage Who defines and acceptsthe stories? POdefines and acceptsthe stories for the agile team Little law establishesthe relationship between Average Wait time, and (Select 2) Little law links average waittime with avg processing rate and avg queue length to arrive at how much wait will be involved Most of the organizationslose their way during which stage of any technological revolution? Turning Point - where incumbents either change their business model andmastertechnology or cease to exist Incremental delivery enables higher gross margins asthe market value of a feature over time Market value of a feature reduces over a period of time and becomes a commodity. Key isto monetize the feature early on by reducing time to market. Inspect and Adapt (I&A) event has 3 parts(choose 3) Three parts of I&A event are: PI System Demo,Quantitative and Qualitativemeasurement and Problem solving workshop To maintain Architecture Runway a commonly used approach isto reserve a percentage of an ART capacity towards Enablers One of the strategy to ensure that Arch Runway is prioritized for evolution and maintenance isto reserve some capacity in every PI towards Arch Runway maintenance High utilization increases variability High utilization leaders to longer cycle time and increases variability in system One Value Stream can have multiple ARTs If a Value Stream has multiple ARTsthen it becomes a candidate for Large Solution What is PDCA cycle? PDCA is Plan-do-check-adjust A Feature definition has a and (Select 2) Every Feature definition has a Benefit Hypothesis and an Acceptance Criteria If you have to design better user experiences and Value Streams, which tool will you use? Empathy Maps help design better user experience and Value Streams In the context of Agile Principles, The best architectures, requirements and designs emerge from ? Self organizing teamsfigure outthe best architectures and designs asthey are closest to the work and are empowered to take the right decisions As an attribute of Systems Thinking, optimizing a does not optimize the system Optimizing a component only giveslocalized improvement and notsystem level improvement In the PI Planning process, which of these are considered as inputs? (select 2) Product Management ownsthe product vision and the prioritization of featuresforthe upcoming PI The two scrum roles of Scrum Master and Product Owner are part of the Agile Team and collectively they share ownership for value delivery and quality. Scrum Master and PO are both specialized roles in an Agile team In SAFe Framework, CoP standsfor CoP standsfor Communities of Practice which have shared interestsin a domain, and have knowledge, experience and practices in that field Which pillar of SAFe House of Lean talks about understanding the full value stream, visualizing and limiting work in process(WIP), and reducing batch sizes and managing queue lengths? Flow focuses on understanding the end-to-end work and delays, visualizing work items and bringing in effective WIP limits to reduce batch sizes Uncommitted business objective value for a team do not get added up into the total of expected business value numbers for that PI Thisis correct, Uncommitted business objective value for a team do not get added up into the total of expected business value numbers for that PI Competenciesin Large Solution SAFe Configuration are (choose 4) Large Solution configuration hasfollowing competencies: Agile Product Delivery, Team and Technical Agility, Enterprise Solution Delivery and Lean-Agile Leadership Who coachesthe Agile team and facilitatesteam meetings Scrum Master coachesthe team and facilitatesthe meetings Selectsome of the DevOps practice domainsrecommended in SAFe (Select 3) Continuous Security emphasizes practices such as security by design, threat modeling, security-ascode, as well as automation in the areas of vulnerability scanning, penetration testing, and intrusion detection. The Configuration Management practice domain represents an - everything as code approach to defining solutions, their runtime environments, and the systems that usher them through the continuous delivery pipeline. Infrastructure Management is a domain that focuses on the - care and feeding of production systems, many of which may be defined as code. Whereas configuration management is a set of design-time practices, infrastructure management is a set of runtime practices. Teams on the ART are organized around flow (True or False) TRUE - The whole purpose of bringing a cross functional ART together isto enable the flow Selectthe team topologiesthat are recommended in SAFe (Select 2) Stream aligned team - organized around the flow of work and has the ability to deliver value directly to the customer. Platform team - organized around the development and support of platforms that provide services to other teams Selectsome of the DevOps practice domainsrecommended in SAFe (Select 3) Value stream management is a business practice that focuses on increasing the flow of business value from customer request to customer delivery, ContinuousQuality is a domain that ensures that quality is built in early in the pipeline and continually managed throughout a solutions life cycle. e.g. TDD, BDD, AB testing, Version Control stresses minimizing the amount and duration of open branches and ensuring that the code base alwaysremains in a deployable state. Can new features be released on demand anytime within a PI? (True or False) TRUE - Release on demand does not necessarily have to be done at PI boundaries. The essence of decoupling the release and deployment of new features as part of the CDP cycle enables this ability to release on demand How SAFe portfolio reconciles a set of possible investments and allocatesthe budgetsto development value streams for the next budgeting period? Participatory Budgeting isthe processthat Lean Portfolio Management usesto allocate the total portfolio budget to its value streams. Selectthe team topologiesthat are recommended in SAFe (Select 2) Complicated sub system team - organized around specific subsystems that require deep specialty skills and expertise. Enabling Teams - organized to assist other teams with specialized capabilities and help them become proficient in new technologies Selectsome of the DevOps practice domainsrecommended in SAFe (Select 3) The Agile Planning and Design domain assuresthat a CALMR approach to DevOps isfollowed from the onset of the delivery life cycle. This domain includes practices such as Lean UX, Agile architecture, backlog management, and emergent design. Continuous Monitoring involves capturing, logging, surfacing, and analyzing production events. These events describe both system behavior and end user behavior and directly support the Measurement and Recovery elements of CALMR. Value metrics are precisely tuned to how customers derive value from deployed solutions. They are outcome-oriented measurements that provide objective evidence that solutions are performing or not performing well in the market. This practice domain containstechniques such as innovation accounting, objectives and key results, key performance indicators, and service level agreements. What are the different types of Operational value streams? (Select 4) Fulfillment value streams represent the steps necessary to process a customer request, deliver a digitally-enabled product or service, and receive remuneration. Examples include providing a consumer with an insurance product or fulfilling an eCommerce sales order. Manufacturing value streams convert raw materials into the products customers purchase. Examples include consumer products, medical devices, and complex cyber-physical systems. Software product value streams offer and supportsoftware products. Examplesinclude ERP systems, SaaS, and desktop and mobile applications. Supporting value streams include end-to-end workflows for various supporting activities. Examples include the lifecycle for employee hiring and retention, supplier contracting, executing the annual budget process, and completing a full enterprise sales cycle. What does Development value streams deliver at the portfolio level? The development value stream at the portfolio level delivers solutions (products, services) that are used by consumers Continuous delivery pipeline infinity loop isrepeated across each iteration (True orfalse) CDP infinity loop of continuous exploration, integration and deploymentis repeated in each iteration and not just at PI boundaries Who develops and commitsto team PI Objectives? Agile team develops and commitsto team PI Objectives Release on Demand is a decision that istaken by business users and not Agile Teams The decision to release on Production is of businessstakeholders Inthe context of Agile Principles- Welcome changing requirements, even late in development. Agile processes harness change for the customer competitive advantage. (True or False) Exploiting variability during product development is key to adaptation and adding value to the product In SAFe CALMR Approach for DevOps, when someone istalking about implementing full-stack telemetry, they are referring to Full-stack telemetry isrelated to the Measurement, ex: time taken to deploy, or recovery time etc In Portfolio Kanban, Epic hypothesisstatement is created at stage Epic hypothesis gets created at Reviewing stage WSJF establishesthe relationship between and (select 2) Cost of Delay and Job Duration are the two key parameters that are used Uncommitted objectives do count in velocity/capacity (True or False) Yes, uncommitted objectives do count in velocity and capacity calculations alculate WSJF Which part of SAFe House of Lean suggeststhat whoever consumes your work is your customer? Respect for People and Culture pillar talks about respecting people who consume your work and treating them as customer Portfolio Canvastemplate is used for identifying Portfolio Canvasis used to identify a SAFe Portfolio In SAFe House of Lean, the pillar of suggeststhat you can understand and manage variability Flow focusses on exploiting variability to the advantage of the product, to improve the value ofthe product Built-in Quality practicesthat can be adopted by businessteams can be (select 2) Automation and Definition of Done can be adopted by teamsthat are not technical teams If a Portfolio isinvesting heavily in Horizon 2 opportunities, that meansthey are investing in core business that is generating profits currently Horizon 2 is about emerging opportunities Holding cost can be lowered by increasing investment in infrastructure and automation Investment in infra and automation lowers the transaction cost and not holding cost Complete the statement from the Agile Manifesto - "Customer Collaboration over " Customer collaboration over Contract negotiation reflectsthat collaboration isthe key, as even very detailed contracts cannot capture the essence of everything that has to be done. And relying on contractsfor every conversation will not build the trust with clients/partners In SAFe Framework in the Spanning Palette, Shared Services has people with specialized skills like Regulatory and Compliance, Information Architecture Shared Servicesteams has people with specialized skillsto support teamsin SAFe model. They could be experts in regulatory and compliance, end user training, infrastructure etc A Value Stream containsthe people who do the work,the systems, and the flow of information and materials A Value Stream contains everything it needsto deliver value to customers What value is assigned to objectives Business owners assign the business value to each team PI objective As part of Continuous Exploration, while architecting a potential design option, threat modelling could be done as one of the key activity Thisis correct, Threat modelling can be done forsome of the design options that are being tried out Which part of SAFe House of Lean recommendsto reflect at key milestones? RelentlessImprovement talks aboutreflecting at key milestones and figuring out the improvement actionsfor future Who acts asthe customer for developer questions POacts as customer for the developers SAFe hasfour configurations, which are SAFe has 4 out of box configurations: Essential, Portfolio, Large Solution and Full An Agile Release Train (ART)teams are An ART has agile teamsthat are crossfunctional team members As part of Inspect & Adapt event, PI System demo is led by (choose 2) PI System demo islead by Product Management, POs Team and Technical Agility Competency hasthe following dimensions(choose 3) Team andTechnical Agility hasthree dimensions: Agile Team, Team of Agile Teams and Built-in Quality With large batch sizes and high utilization combination, predictability Predictability comes down as Cycle time increases with high utilization and large batch sizes Scrum Masters are responsible for what all during the PI Planning (select 3) Scrum Masters play an integral role in PI Planning. They are entrusted to ensure timebox for the activities performed in the two days of PI planning fortheir teams. Scrum Master also ensure they co-ordinate with other teams on dependencies and clarifications on ambiguities Utilizing Capacity Allocation is a guardrail to ensure that the right investments are made within the budgets TRUE - Capacity Allocation guard rail ensuresthat investments are put in right area As part of Inspect & Adapt Problem Solving Workshop, what happens once the team hasidentified the Once the biggest root-cause isidentified using Pareto analysis, the team needsto now restate the new problem Who ownsthe feature priorities in the program backlog? Product Management ownsthe product vision and the prioritization of featuresforthe upcoming PI Strategic themes connect a to the strategy ofthe Enterprise Strategic Themes connect Portfolio to the Enterprise strategy In the PI Planning process, which of these are considered as outputs? (select 2) Team and Program PI objectives are commitments from the teams for the next PI. Program board allows a visual representation of the features and major dependencies across teams. It also includes major milestones and shared teams Which SAFe Core Value suggests acknowledging and learning from mistakes and not punishing the messenger? Transparency core value encourages admitting mistakes, and encouraging people to talk about problems without fearing any backlash A Feature can span across multiple Program Increments FALSE - A Feature fits within one PI Knowledge workers are intrinsically motivated by Autonomy, Mastery and Autonomy,Mastery and Purpose are the motivators for knowledge workers SAFe Core Value of coverssupporting investment in reducing technical debt Built-in Quality core value encourages people to keep their focus on tech debt reduction and have properstrategy to invest in it on ongoing basis What doesthe team develop in the first team breakout in the PI Planning? Teams develop draft plansin the first breakoutsession. Risks and impediments are identified and brought forward for discussion and management attention In SAFe Implementation Roadmap, what happens afterlaunching moreARTs and Value Streams? Extend to the Portfolio continues after launching more ARTs and Value Streams During new technology and financial capital combine to create a Cambrian explosion of new entrants, disrupting the entire industries from the previous age Installation period where new technology and entrants disrupts the market Customer Journey Maps are used to design the end-to-end Customer experience Customer Journey Maps are used to design e2e Customer experience Lean Portfolio Management Competency hasthe following dimensions(choose 3) Lean Portfolio Management competency hasfollowing 3 dimensions: Strategy & Investment Funding, Lean Governance and Agile Portfolio Operations System demos are done every twoweeksfrom staging/another environment which resembles production TRUE - System demo happens for all teamsin a program with integrated code being showcased on an environment that resembles Production every two weeks Cadence limits batch size to a single interval TRUE - Cadence limitsthe batch size to single interval, enforcing discipline and practice of keeping small batch sizes Lean Agile Leadership Competency hasthe following dimensions(choose 3) Lean Agile Leadership Competency hasthe following 3 dimensions: Leading Change, Leading by Example, and Mindset and Principles In John Kotter view of how to lead change effectively,the laststep is The laststep is to anchor new approaches in the culture as culture change happenslast To make informed economic decisions, the economic framework usesfollowing five trade off parameters: Product Cost, Development Expense, Risk, and Lead time and Value are the other two trade off parameters
Written for
- Institution
- SAFE 5 AGILIST
- Course
- SAFE 5 AGILIST
Document information
- Uploaded on
- February 19, 2024
- Number of pages
- 24
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
safe 5 agilist exam 51 2023 verified question