JATC homework code practice test || All Answered Correctly
How many wires do you need to transmit 3 phase power correct answers 3 wires The code defines a "continuous" load as one in which the load is likely to continue for _ hour or more. correct answers 3 A transformer can be fed off the secondary feed. (T/F) correct answers True According to code, a wire located in a partially protected area such as under a roofed open porch would be located in? correct answers A damp location Article 100 informational note In dealing with motors and related equipment when the code specifies "in sight from" it means that....... correct answers The equipment must be visible. Must not be more than 50ft. Article 100 What is not permitted for connecting #6 wire and larger to terminal parts? correct answers Wire binding screws 110.14(A) What is the head space required for a panel? correct answers 6.5 ft 110.26(A)(3) In all cases, the work space shall permit at least a _ degree opening of equipment doors. correct answers 90° 110.26(A)(2) The terminal for the _ shall be the one connected to the screw shell. correct answers Grounded conductor 200.10(C) Circuits fed from direct current systems ungrounded conductors 4awg or larger shall _ at all terminations. correct answers Identify by polarity 210.5(C)(2) In a dwelling unit kitchen which receptacles need to be GFCI A) A receptacle installed to serve kitchen countertop surface B) Receptacle installed under sink C) A receptacle installed within 6ft from the the top inside edge of the bowl of the sink. D) A and C E) All of the above correct answers D 210.8(A)(6&7)
Document information
- Uploaded on
- February 16, 2024
- Number of pages
- 10
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers