100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ACI Concrete Practice Exam Questions and Answers | Verified & Updated 2024 | 100% Correct

Rating
-
Sold
-
Pages
9
Grade
A+
Uploaded on
15-02-2024
Written in
2023/2024

ACI Concrete Practice Exam Questions and Answers | Verified & Updated 2024 | 100% Correct The end of the temperature sensing portion of the temperature measuring device is submerged a minimum of _____ into the freshly mixed concrete - Answer ️️ -3 The temperature measuring device shall be capable of measuring the temperature of freshly mixed concrete from ___ to ___ degrees - Answer ️️ -30, 120 The temperature measuring device should be verified ____ or whenever there is a question of ___ - Answer ️️ -annually, accuracy The temp of concrete can be measured in wheelbarrow - Answer ️️ -True The temperature of the concrete can be measured in a wall form - Answer ️️ -True A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature - Answer ️️ -True What must be done to the sample container prior to sampling concrete - Answer ️️ -Wet the container what must be done to the concrete surrounding the temperature measuring device after the device is submerged in concrete. - Answer ️️ -Close the voids surrounding device After temp is taken what must be done after - Answer ️️ -Record temp The temp is recorded to the nearest - Answer ️️ -1 F How long must the temperature measuring device remain in the freshly mixed concrete? - Answer ️️ -2-5 min According to Test Method C1064/C1064M, what is one reason to take the temperature of concrete? - Answer ️️ -Verify conformance to spec A maximum temperature of freshly mixed concrete is specified in Test Method C1064/C1064M, True or False - Answer ️️ -False The sample of concrete used for temp determination must be rodded 25 times, true or false - Answer ️️ -False Sampling by this practice covers procedures for obtaining representative samples, on which tests are to be performed to determine ___ with quality requirements of the specifications under which the concrete is furnished. - Answer ️️ -Compliance This practice covers sampling from five types of equipment, which are ___________, ___________, __________, __________, and __________. - Answer ️️ -Stationary, Paving, Revolving Drum, Continuous, Open Top The elapsed time between obtaining the first and final portions of a composite sample shall not exceed _____ minutes. - Answer ️️ -15 Portions of a composite sample shall be throughly remixed before beginning tests on the sample - Answer ️️ -True Start the tests for slump, temperature, and air content within how many minutes after obtaining the final portion of the composite sample? - Answer ️️ -5 Start molding specimens for strength tests within how many minutes after fabricating the composite sample? - Answer ️️ -15 The concrete sample must be protected from - Answer ️️ -Sun, Wind, Rapid Evaporation and Contamination The minimum size sample for making strength test specimens are - Answer ️️ -1 cubic foot When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced intervals during discharge of the middle portion of the batch - Answer ️️ -2 When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of _____ regularly spaced intervals during discharge of the middle portion of this batch. - Answer ️️ -2 When sampling from a paving mixer, obtain samples from atleast ___ different portions of the pile and combine them into one composite sample for test purposes. - Answer ️️ -5 Concrete samples from a truck mixer must be obtained before any water or admixtures are added to the mixer at the job site. True or False? - Answer ️️ -False The composite sample from a truck mixer must be obtained from the ____ portion of the batch. - Answer ️️ -Middle When the concrete contains aggregate larger than that permitted for a particular test method, the sample of concrete must be _____ _____ before making the test. - Answer ️️ -Wet Sieved What must occur before a sample of concrete can be taken from a revolving drum mixer - Answer ️️ -All water and admixtures must

Show more Read less
Institution
ACI Concrete
Course
ACI Concrete









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ACI Concrete
Course
ACI Concrete

Document information

Uploaded on
February 15, 2024
Number of pages
9
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EmilyCharlene Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
442
Member since
2 year
Number of followers
139
Documents
21009
Last sold
2 days ago
Charlene\'s Scholastic Emporium.

Your Actual and Virtual Exam Tests Excellent Tutor.

3.6

96 reviews

5
44
4
13
3
15
2
7
1
17

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions