• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

SAFe Agile Scrum Master Study Guide (Answered) Verified Solution

Document preview thumbnail
Preview 2 out of 7 pages

SAFe Agile Scrum Master Study Guide (Answered) Verified Solution ART Agile Release Train PO Project Owner PI Program Increment Innovation and Planning Iteration Occurs every PI and serves multiple purposes. It acts as an estimating buffer for meeting PI objectives, as well as providing dedicated time for innovation, continuing education, and PI planning and Inspect and Adapt (I&A) events. Inspect & Adapt (I&A) A significant event, held at the end of each PI, where the current state of the solution is demonstrated and evaluated by the train. Teams reflect and identify improvement backlog items via a structured, problem-solving workshop Iteration A basic building block of Agile development. Each is a standard, fixed-length timebox, where Agile Teams deliver incremental value in the form of working, tested software and systems. What is the recommended timebox duration for an Iteration? 2 weeks; however, 1-4 weeks is acceptable, depending on the business context. Who participates in the Inspect & Adapt (I&A) phase? All stakeholders, including: 1. The Agile Teams 2. Release Train Engineer (RTE) 3. System and Solution Architect Engineering 4. Product Management, Business Owners, and others on the Train What results from the I&A phase? Improvement backlog items that go to the Program Backlog for the next PI Planning event 3 parts of I&A PI System Demo Quantitative Measurement Retrospective and Problem-Solving Workshop Purpose of PI System Demo To show all the Features the ART has developed over the course of the PI PI System Demo Timebox ~1 hr or less What is one primary measurement to be considered in quantitative metrics? Program predictability measure Retrospective goal To identify whatever issues they would like to address Retrospective objective To identify a few significant problems that the teams can potentially address PDCA Cycle Plan Do Check Adjust Scrum Masters Servant leaders and coaches for an Agile Team. Help educate team in Scrum, XP, Kanban and SAFe, ensuring the agreed Agile process is being followed. Help remove impediments and foster an environment for high-performing team dynamics, continuous flow and relentless improvement. Scrum Master Responsibilities Exhibits lean-agile leadership Supports the team rules Facilitates the team's progress toward team goals Leads team efforts in relentless improvement Facilitates meetings Supports the PO Eliminates impediments Promotes SAFe quality practices Builds a high-performing team Protects and communicates Responsibilities on the train Coordinates with other teams Facilitates preparation and readiness for ART events Supports estimating SAFe takes a pragmatic approach and assumes, in general, that the Scrum Master is a _____ - ____ role. Part-time Program Increment (PI) Planning A cadence-based, face-to-face event that serves as the heartbeat of the Agile Release Train (ART), aligning all the teams on the ART to a common mission and vision. Who facilitates the PI Planning event? Release Train Engineer (RTE) In which iteration does PI Planning take place? Innovation and Planning Iteration __ ________ is essential to SAFe; if you are not doing it, you are not doing SAFe. PI Planning Business Benefits of PI Planning Establishing face-to-face communication across all team members and stakeholders Building the social network the ART depends on Aligning development to business goals with the business context, Vision, and team project PI objectives Identifying dependencies and fostering cross-team and cross-ART collaboration Providing the opportunity for "just the right amount of architecture and Lean User Experience (UX) guidance) Matching demand to capacity, eliminating excess WIP Fast decision-making PI Planning Inputs Business context Roadmap and vision Top 10 features of the Program Backlog PI Planning Outputs Committed PI objectives (A set of SMART objectives that are created by each team with the business value assigned by the Business Owners) Program board (this highlights the new feature delivery dates, feature dependencies among teams and with other ARTs, and relevant milestones) 3 Areas of Preparation for a Successful PI Planning Organizational Readiness Content Readiness Facility Readiness Organizational Readiness Strategic alignment and teams trains setup Content Readiness Management and development preparedness Facility Readiness The actual space and logistics for the event Organizational Readiness Considerations Planning scope and context - is the scope (product, system or technology domain) of the planning process understood? Do we know which teams need to plan together? Business alignment - is there reasonable agreement on priorities among Business Owners Agile teams - Do we have Agile teams? Are there dedicated developer and test resources and an identified Scrum Master and Product Owner for the team? Content Readiness Considerations Executive briefing - a briefing that defines the current business context Product vision briefing(s) - briefing(s) prepared by Product Management including the top 10 features in the product backlog Architecture vision briefing - a presentation made by the CTO, Enterprise Architect, or System Architect to communicate new enablers, features, and Nonfunctional Requirements (NFRs) Facility Readiness Considerations Facility - this room must be roomy enough for all attendees, with breakout rooms if necessary Facilities/tech support - these people need to be identified in advance and reachable during setup and testing, and the event itself


Document information

Uploaded on
February 13, 2024
Number of pages
7
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
QUICKEXAMINER
3.6
(15)
Sold
92
Followers
44
Items
5367
Last sold
6 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.