ASQ CQE Certification Exam Sample Questions Graded A +
Que.01: A process capability analysis is NOT used to a) determine the ability of a process to meet specifications b) maintain a process in a state of statistical control c) establish new specifications d) prioritize competing processes - Answer-b) maintain a process in a state of statistical control Que.02: Taguchi defines loss as a function of which of the following? a) Manufacturing cost and product reliability b) Frequency of out-of-control occurrences c) Product maintainability and availability d) Variability and deviation from target - Answer-d) Variability and deviation from target Que.03: Which of the following types of charts is based directly on specification limits? a) Cusum b) PRE-control c) X and mR d) X and R - Answer-b) PRE-control Que.04: A type of line graph used to assess the stability of a process is called a a) control chart b) Pareto chart c) check sheet d) cause and effect diagram - Answer-a) control chartQue.05: Which of the following is necessary when a complete quality cost system is implemented? a) Cost data are presented in broad categories. b) The quality department solely maintains the system. c) Top management supports the system. d) Implementation occurs simultaneously company-wide - Answer-c) Top management supports the system.
Written for
- Institution
- ASQ CQE Certification
- Course
- ASQ CQE Certification
Document information
- Uploaded on
- February 9, 2024
- Number of pages
- 2
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal